After activation, System Utility access for each user must be setup in the ManEx Security module. Users with “supervisor’s rights” will automatically have access.
Enter System Utility/Convert Consigned to Turnkey
This module will convert Consigned make products into Turnkey make products.
Note: If you don’t want to over write the existing BOM, you might consider setting up a new Revision via the ECO module.
This function is to allow users who have a bill of materials (an assembly) that contains consigned parts to convert that BOM to ALL turnkey (buy) parts. Because the ManEx scheme requires users to enter an internal part number in order to establish a consigned part, the internal numbers already exist. The utility takes advantage of that by asking the user for the ASSEMBLY that they wish to have the components changed from consigned to turnkey. So when the user gets the prompt, they are to enter the ASSEMBLY number, and not the component number. When the program is completed, the user should then check the BOM for the assembly they changed and be sure that it has in it, what’s desired, primarily no more consigned parts.
|
|
The following screen will appear:
In the system you have a BOM already setup with Consigned part numbers.
Type teh Product Part Number (Assembly) and applicable revision number into the fields:
Depress the OK button. You will receive a message that the conversion has been completed.
Return to the ManEx system and verify that the BOM has been properly converted over to Turnkey.
|