1. Production
1.1. Prerequisties for Production Setup
In general, the production work is divided up among several departments. Some products may require that some work that is done in each of these departments. Other products may require that work be done in only a few of all the departments in operation.  In order to identify the work processes for each product, ManEx allows the user to define Work Centers.  These Work Centers describe a physical aspect (usually) of production operations that applies a specific type of labor to the product.  Examples of work centers may be: SMT - where the product is assembled on a surface mount line; AI - where parts are Auto-Inserted into the product; Wave - where the parts are wave soldered; Cleaning; Inspection; Test; etc.  Each of these work centers contains within it, a common aspect of production.   For example, in SMT, the surface mount operator’s pay scale is probably higher than other parts of production, the parts are all contained within one area, the setup time is appropriate to one lot of a given product, and the parts are contained within the work area.   If inventory counting is necessary, the user can identify that the parts are in the work center.

 

The user may create as many work centers as necessary to define the production activities that occur within the operation.

 

Within a work center, the user may establish additional definitions, called Activities. These activities may be set up separately from the work centers, and then used as needed within individual work centers. The activities may be assigned their own hourly charge rate.

 

And within an Activity, there is yet another classification called sub-activities, which have activity costs associated with them. These activity costs are established in the Activity Cost & Volume Type setup.

 

Also, in this section the setups for Quality items are accomplished, and will be discussed in each setup.  Outside Program Calls Setup is also available.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
1.1.1. Manex Notes Matrix
 
See the word attachement  <Notes Matrix.doc>>   for a table which shows the cross-reference for all ManEx Notes.
1.2. Introduction for Production Setup

This section covers the production setup to be used in all production related modules. Please take time to think about how you want to use these tables for best production management.  Some sample data is provided with this setup as a guideline.  These tables are used in various modules throughout the system.

 

The production application module setup section allows you to prepare tables for specific production related modules your company has purchased.  Once setup in the system, you will be able to use these tables and/or perform certain functions automatically.  These tables are completed by preparing worksheet tables and/or setting certain switches.

 

Production System worksheet covers the following modules:  Work Shift Set Up, Activity Costing & Volume Type Set Up, Package Configuration, Production Work Centers & Activities, Time & Attendance Types, Shop Floor Tracking Defaults, Production Scheduling Method, Quality Defect Codes, CAR Problem Types, CAR Number Types,  Tools Setup and Outside Program Calls Setup. 
 
This section will first define the nature of each of the Production Setup screens, then describe how to fill out the work sheets, and finally, how to enter the data into the ManEx system.
1.3. Work Shift Setup

1.3.1. Prerequisites for Work Shift Setup
Complete the attached worksheet and  "Mark as Completed RoadMap Section B Item 3-abefore continuing the setup.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
 
 


1.3.2. Introduction for Work Shift Setup

Work Center Shift Setups may be established for use in capacity planning. Your work shift setup is a factor in your capacity. The more work hours you have the higher your capacity.  Each work shift has a starting and ending time (entered in 24-hour format). The user may enter as many shifts as may be needed to describe the availability of resources. Shifts may overlap, and be any duration. Provision for multiple breaks and lunches are made for long shifts. 

1.3.3. Fields & Definitions for Work Shift Setup

 

Shift No

The shift number.

Shift Description

The description of the shift, 25 characters maximum length.

Start Day of Week

The day of the week considered to be the first day of the shift for the week. 

Number of Days 

The number of weekdays that define the shift. 

Total Hours

Total time actually working, does NOT including breaks and lunches. 

Division 

The division number for that shift, if applicable. 

Start and End times

This is where you setup the beginning and end of shift, along with the break and lunch times.

Activities:

 Day: The beginning and end of the shift

 Break (1-4)      Up to 4 break times defined.   

 Lunch (1-2)     Up to 2 lunch breaks defined.    

 

 

 

 

 

 

 

 

           

1.3.4. How To ..... for Work Shift Setup
1.3.4.1. Setup the Work Shift Module

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/Work Shift Setup 

 

 

The following screen will be displayed:

The user may Add new or Edit and Delete existing shifts.

The user must either Save or Abaondon to close the screen.

Where Used:  In the job routing functions for a product.

«Mark as Completed in RoadMap in Section B Item 3-a»

1.4. Activity Costing and Setup Type Setup

1.4.1. Prerequisites for Activity Costing & Setup Type Setup
Complete the attached worksheet and  "Mark as Completed RoadMap Section B Item 3-bbefore continuing the setup.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.


1.4.2. Introduction for Activity Costing & Setup Type Setup

This module is essential if you are using Activity Based Cost (ABC) methodology for managing the production floor.   The information entered here forwards to Production Work Center/Activity Setup.  Then both setups are used in the MANEX Capacity Planning module. 

 

Activity Costing and Activity Volume Type Description setup is a requirement only if your company is employing Activity Based Cost (ABC) methodology for managing the production floor. The Activity Costing and Activity Volume Type Descriptions are used in Production Work Center/Activity setup to assign Activity Costs and Activity Volume Types to a production Work Center/Activity.  The Activity Volume Type Description is a pre-requisite for Production Work Centers & Activities / Activity Setup & Run tab.

Your company should become knowledgeable about the principles of ABC prior to using Activity Costing and Activity Volume Type Descriptions.Activity Cost and Volume types allow the users to define the costs and capacity for individual activities within a work center.  It is used in the capacity planning module to determine available and required capacities.    It is also used to assign costs of operation.  For example, there may be several machines that can do the same job in a work center.  However, one may have a higher operating cost, but also greater capacity.  Both machines can be displayed as a resource.  The selection of the machine is performed in the routing and capacity modules.

1.4.3. How To ..... for Activity Costing & Setup Type
1.4.3.1. Setup the Activity Costing

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/Activity Costing Description 

 

The following screen will be displayed:

To ADD new Costing descriptions, depress on the ADD button, enter the description.  When complete depress the Save or Abandon changes  button.  

To DELETE existing descriptions, highlight the description you want to delete, depress the Delete button.  The following popup screen will appear:
 
 
 
Depress "Yes" to Continue or "No" to abandon changes.
 
To REORDER descriptions, click and drag the activities to the desired order. When exiting the re-order changes will be saved. 
 
Where Used:  In the Production Work Center/Activity Setup.

«Mark as Completed in RoadMap in Section B Item 3-b»
1.4.3.2. Setup the Activity Setup Type Description

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/Activity Setup Type Description 

 

The following screen will be displayed:

To ADD new Activity Setup Type descriptions, depress on the ADD button, enter the description.  When complete depress the Save or Abandon changes  button.  

To DELETE existing Activity Setup Type descriptions, highlight the description you want to delete, depress the Delete button.  The following popup screen will appear:
 
 
 
Depress "Yes" to Continue or "No" to abandon changes.
 
To REORDER descriptions, click and drag the activities to the desired order. When exiting the re-order changes will be saved. 
 
Where Used:  In the Production Work Center/Activity Setup.

«Mark as Completed in RoadMap in Section B Item 3-b»
1.5. Package Configuration

1.5.1. Prerequisites for Package Configuration
 
Complete the attached worksheet and  "Mark as Completed RoadMap Section B Item 3-cbefore continuing the setup.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
 


1.5.2. Introduction for Package Configuration

Package configuration setup is provided so that the user may define a machine’s Units Per Hour.  This definition can then be accessed in the Production Work Centers & Activities setup/Activities Setup & Run tab.

1.5.3. Fields and Definitions for the Package Configuration
 
 
 

Package Configuration

This is the user defined field for Package Configuration.Normally some reference to Units per Hour.

Description

This is the description pertaining to the Package Configuration.

1.5.4. How To ..... for Package Configuration
1.5.4.1. Setup the Package Configuration Module

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/Package Configuration Module

 

The following screen will be displayed:

To ADD a record, depress the Add button, type in the Package Configuration and description.

To EDIT a record, depress the Edit button,  edit the Package Configuration and/or description.

To DELETE a record, highlight the Package Configuration and description you wish to delete, depress the Delete button.

The user must then Save or Abandon changes after modifications are complete.
"Mark as Completed RoadMap Section B Item 3-c" 

Where Used:  In the Production Work Center/Activity Setup.

1.6. Production Work Center & Activity Setup

1.6.1. Prerequisites for Production Work Centers & Activities
Work Center Work Shift must be established if you intend to identify a shift number and description to a work center.   Activity Costing & Volume Type setup must be established if the user plans to identify Activity Costs and/or volume types with activities.  Setup type description must be set up in the Activity Costing & Volume Type Setup.  Component package configuration must be set up in Package Configuration.  
 
Complete the attached worksheet and  "Mark as Completed RoadMap Section B Item 3-dbefore continuing the setup.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
 

1.6.2. Introduction for Production Work Centers & Activities
Production Work center activities are optional sub-sets of work center departments. Activities may be defined prior to establishing work centers, and then used as more detailed actions within a work center.  Each of these activities may be assigned a separate hourly charge rate. 


Please note:  As of 03/03/2016:

We are actually in the process of implementing optional routing steps in place of activities. We are working to simplify and flatten the process to make it easier for everyone.

Presently, you can still choose to setup activities if desired and then decide if you want to track production through activities or not. With the current activity setup this decision is universally applied for all work centers and work orders.

With the optional routing steps that we are implementing, you would still have to decide if you want to add activities or not (optional steps), but now you would be able to decide on the fly if you want to track production through those steps. It also means that you would have fewer places to maintain in setup.

1.6.3. Fields & Definitions for Production Work Centers & Activities

1.6.3.1. Work Center Tab



Work Center ID
This is the abbreviated (4 character) code for the name of the work center

Work Center

This is the description of the work center. It may be 25 characters in length.  Work Centers are used to calculate Values within Job Costing.

Inside / Outsource

Choose (I) inside or (O) outsource for site of activity.

Hourly Charge Rate 

This is the standard hourly rate for the Work Center highlighted.

Shift Number

This is the number of the shift assigned to the highlighted work center.

Shift Description

This is the description of the shift assigned to the highlighted work center.
From  Shift Start Time
To  Shift End Time
Total Hours  Total Hours of Shift
Assign work center to workstations (button)

If a customer wants to install workstations along the production line, with scanners to read serial numbers as they passed down the line,  this button provides the ability to limit a work station (specific computer) to be able to only transfer material “FROM” a certain Work Center.  So, when a user first opens the "SFT by WO" or "Shop Floor Tracking by Bar Code" module, the module will use the default work center assigned for this workstation, but if user chooses to use a different work center, supervisor approval or a user that has the option  "Allow Changing Default Work Center for Serial Number Transfer" box checked within the Security module is required to continue.  After a supervisor's or user with this option’s password is entered, the default work center will be changed to the one that the supervisor entered password for.   For Example:   the workstation is assigned to use “TU” as default work center, now if user chooses to use “AI” to transfer, the system will ask for supervisor’s password, if user cancels the password, the default work center will still be “TU”, but if the supervisor enters his/her password on this machine, the default work center will be changed to “AI”.  If now the user tried to transfer from “TU” again, the system will ask for supervisor’s password again.  If user exits the module and come back, the default work center will be “TU” again. 



Defect Code Entry In-Line Mode, the system will check to see if the serial number is currently in the Work Center which was set up here.  If not, a special supervisor’s password is required to transfer the serial number FROM a different Work Center.  After the supervisor password is entered, the system will use the new Work Center to be the default FROM Work Center until the user closes the screen.  The next time the user opens the screen, the default FROM Work Center will be changed back to the one defined in Systems Setup.
1.6.3.2. Activity Tab





WC

This is the description of the work center highlighted in the Work Center tab.

Activity ID

This is the abbreviated (4 character) code for the name of the activity.

Activity Description

This is the description of the activity being performed.It may take 25 characters in length. 

Standard Rate

This is the standard hourly rate for the activity performed within the Work Center. 

Cap

Click here for capacity totaling election.Capacity totaling means that if multiple activities are used in a work center, and if there are multiple resources in the activities, the capacity will be the sum of the resources rather than limited by just one resource. 

Activity Costing Description 

This field is selected from the available activity costing descriptions created in the Activity Costing & Setup module within system setup.

Charge Rate

This is the field used to enter hourly charge rates, for each activity. The formatting is three digits to the left of the decimal, and two to the right (999.99). If this optional field is entered, it will be used to determine the hourly charge rate of the activity to which it is assigned.

 

1.6.3.3. Activity Setup & Run Tab
 

The information set up in this screen will be used in Capacity Planning & Dynamic Scheduling modules.
 

Setup Type List

The Setup Type description is input into a previous screen “Activity Costing & Setup Type Setup/Activity Setup Type Description”.  

Setup Type Description

This is the description of the setup type. 

Time

This is the time in hours and minutes associated with the setup type. 

Setup Instruction (button) 

This button allows the user to enter instructions for setting up the Setup Type and applicable pictures.

 

Component Package Configuration List

The Component Package Configuration is set up in a prior screen. See Setup Package Configuration.

Component Package Configuration 

For a given machine’s Parts Per Unit, this field identifies the user defined configuration. 

Volume/Hour

This is the volume type per hour.

Yield Factor 

This is the yield percentage.

Note: In order to add Times in Routing, the Run and Setup Time MUST be selected in the Production Schedule Setup module.
 
Using Run and Setup Times in the Production Schedule Setup module is preferred when there is great variability in the products produced and the setup and run rates in each Work Center.

Using the Run and Setup Times in System Setup under this module, Work Center Setup, is preferred when the product flow is uniform, the machine rates are well established and the setup times very uniform regardless of product.

Use of Run and Setup Times in the Production Schedule Setup module is optional unless either Job Costing or Capacity Planning Modules are in use.

 
1.6.4. How To ..... for Production Work Centers & Activities
1.6.4.1. Setup the Production Work Centers & Activities


Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password
The following screen will be displayed, enter the Production/Production Work Centers & Activities






The following screen will be displayed:
 
For the highlighted Work Center, enter in the Hourly Charge Rate.

 

To add a Work Shift, highlight the Work Center, then depress the "Add Work Shift"   button.    The following popup screen will appear to select from.  The work shifts listed on the popup screen have been setup in the Work Shift Setup module.  

Highlight the work shift(s) and depress the "OK" button. 
 

 

To Assign Work Center to Workstations In this screen, highlight the name of the Work Center. Depress the button at the bottom of the screen "Assign work center to workstations",  the following assignment screen appears: 


 
To enter a new assignment, depress the Add button.  When setting up a workstation user must enter the Full computer name in the Workstation Name field and the Computer description in the Workstation Description field.  See Example below.
 
 

 


Depress the Activity tab.
 
The user may add Work Center Activities by selecting the Add button from the main tool bar. 

 

To add an activity ID and related description, choose the applicable work center from the drop down menu:

Enter the Act ID, Activity Description. 

Click on the Cap Totaling box to elect calculating capacity.

Save changes or Abandon Changes. 

 

 
To attach a Cost Rate to an activity, click on the Edit button, then on the Add button (bottom of screen) in the Activity Costing Section.

 
Select the activity from the pull down:  (The activity costing descriptions are defaulted in from the Activity Costing & Setup Type Setup module) 

 
Enter in the Cost/hr and the Charnge/Hr. 
 

Save changes or Abandon Changes. 

 
 
 
Once the Activity ID and Description, Cap Totaling election and hourly charge rate have been entered, depress the Activity Setup & Run tab.

 
 

Depress the Edit button.  For the Setup Type Description section.  Depress the  Add button (on screen).

 
Enter the time in hours and minutes

Select the Setup Type Description from the pull down:  (These are defaulted in from the Activity Costing & Setup Type Setup module).



 
This button allows the user to enter instructions for setting up the Setup Type. 

This button allows the user to load a photo for an instruction. The photo file should be in the ManEx directory, and should be BMP or TIF format.



For Component Package Configuration, depress the Add button (on screen)


Select the Component Package Configuration from the pull down menu: (The Component Package Configuration(s) are defaulted in from the Package Configuration module).


Enter in the Volume per hour, and then the yield factor %.

Volume is the number of units per hour. This may be boards per hour, units per hour, connections per hour, etc.

The Yield factor affects the volume such that lower yield means it will take longer to make the same number of good parts.For example, if the standard volume is 100 parts per hour, and the total yield is 80%, then the effective yield would be 80 parts per hour.



Once all changes are complete depress Save or Abandon changes.
 

Where Used:  In all Shop Floor related Activities.

«Mark as Completed in RoadMap in Section B Item 3-d»

1.7. Time and Attendance Types

1.7.1. Prerequisites for Time & Attendance Types
Complete the attached worksheet and  "Mark as Completed RoadMap Section B Item 3-ebefore continuing the setup.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
 
 


1.7.2. Introduction for Time & Attendance Types

These types are established to be available during time and attendance tracking in production. Please refer to the Time & Attendance Management module.  If the user chooses to track an employee’s time, the time may be associated with attendance or a specific job (Work Order). Attendance is in for the day and out at the end of the day, like a time clock. Job (Work Order) logging is when an employee begins work on a work order (product) or finishes working on a work order. When the employee visits the screen for job (Work Order) logging, they are prompted to define whether they are logging in for attendance, defined as “Time Clock” or job defined as “Job (Work Order) In Or Out”.

1.7.3. Fields & Definitions for Time & Attendance Types

 

 

 

Time Log Type Is the code for the time setting description.  Example V-Vacation, H-Holiday, T-Time Clock, W-Work Order, etc. 
Description Description of the Time Log Type Code. Example Vacation, Holiday, Time Clock, etc.
Pay

If you check this box, that means the company will pay for that type.  For example, V-Vacation would be checked because it is company policy to pay for vacation time.  If you set one up as U-Unexcused absence, this would NOT be checked, because the company would not pay for unexcused absences. If there was one set up as J-Jury Duty, the pay box might be checked if it is the company policy to pay for jury duty.

Allow to enter hours directly in Time Log Management 
If this box is checked,  the user will be able to enter hours directly in Time used field for that type in the Time Log Management module.  Once user adds a new record for a time log type which is allowed to enter hours directly, the time in and time out fields will be blank out and disabled, and user can enter how many hours for that record directly.  Otherwise, the user has to enter time in/out.  
 
The system only allows user to enter "RT" no "OT" can be entered.  Therefore, user can not check type "W" or "T" to enter hours directly.  The system will have to calculate the total log in time and determine what's the RT and OT for type "W" and "T".
 
The time in and out will also be blank if the type is "H" -- holiday, and the system will use shift to calculate the RT, no OT will be calculated.
Time Card Regular TIme/Overtime Hour Calculation 

Select the first radial, If you want to setup to to pay overtime after  __ hours per day or week. Enter the number of regular time hours in the period.  Any time after these hours will be paid at overtime rates.  Select the Start Day of Week. This means the OT hours are calculated starting from that day. Then check the box if you would like to enforce the breaks to be included in the cacluated hours. 

 

Select the User Work Shift radial to use a Shift start and end time.

After Hours Worked Enter the number of regular time hours in the period.  Any time after these hours will be paid at overtime rates.
Start Day of Week Select the Day of Week you want to start the week on Sunday, Monday, etc.  This means the OT hours are calculated starting from that day. 
Enforce Breaks This box only applies to type "T"-Time Card.  When checked it will deduct the lunch 1 and 2, but does not deduct the break times from the total hours.  If unchecked it does not deduct lunch 1 and 2, or break times from the total hours.  For example see attached "Print Screens_2006-02-09_a.doc".
User Work Shift Check this radial if you want this as a work shift
Maximum hours logged on in the system

This is the number of hours which, if a user has remained logged on, the system would automatically log them off, assuming that they left without logging off.  Note:  ManEx suggests that you populate this field with a number of 1-24.  If left empty or with a -0-, the automatic loggout process will NOT run and will NOT logout the user automatically.   This field is restricted to only allow a minimum entry of "0" and a maximum entry of "24".

Shift Start Time  +/-

Minutes reverted to Start Time and End Time Allows users to consider a line at the timeclock.  If an employee logs in a few minutes early, or late, the system will log them in at the beginning of their shift. 

 

 

 

 

 

1.7.4. How To ..... Time & Attendance Types
1.7.4.1. Setup the Time and Attendance Module

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/Time & Attendance Types Module

This section is provided to add additional ways for logging and keeping track of time spent by employees on each work order. Enter various different time tracking modes in this section.

 

The following screen will be displayed:

The ADD, EDIT, and DELETE buttons are available.

The user adds a type by selecting the ADD button from the main tool bar and entering the type in the entry field box. Time and Attendance Types indicate how the hours are to be collected. (In the future, General Ledger Numbers will be associated with each type listed.)  Therefore, each type of job (Work Order) logging will collect charges accordingly.

If you check the Pay box, that means the company will pay for that type.  For example, an unexcused absence would NOT be checked, but Jury Duty might be checked if it is the company policy to pay for jury duty.

"Allow to enter hours directly in Time Log Management" checkbox  in T&A setup, if it's checked,  the user will be able to enter hours directly in Time used field for that type in the Time Log Management module.  Once user adds a new record for a time log type which is allowed to enter hours directly, the time in and time out fields will be blank out and disabled, and user can enter how many hours for that record directly.  Otherwise, the user has to enter time in/out.  
 
The system only allows user to enter "RT" no "OT" can be entered.  Therefore, user can not check type "W" or "T" to enter hours directly.  The system will have to calculate the total log in time and determine what's the RT and OT for type "W" and "T".
 
The time in and out will also be blank if the type is "H" -- holiday, and the system will use shift to calculate the RT, no OT will be calculated.

Overtime hours are established for determining overtime pay if the timeclock function is used without shift data per person.  Hours entered in excess of X hours per day or week would be counted as overtime.

Enforce Breaks - This box only applies to type "T"-Time Card.  When checked it will deduct the lunch 1 and 2, but does not deduct the break times from the total hours.  If unchecked it does not deduct lunch 1 and 2, or break times from the total hours.  See attachment "Print Screens_2006-02-09_a.doc" for example. 

User Work Shift - user will check this radial if they want this as a work shift.

Maximum hours logged on in the system is the number of hours which, if a user has remained logged on, the system would automatically log them off, assuming that they left without logging off.    Note:  ManEx suggests that you populate this field with a number of 1-24.  If left empty or with a -0-, the automatic loggout process will NOT run and will NOT logout the user automatically.
This field is restricted to only allow a minimum entry of "0" and a maximum entry of "24".

Shift Tolerance allows users to consider a line at the timeclock  .If an employee logs in a few minutes early, or late, the system will log them in at the beginning of their shift.

Once you have completed all modifications to screen select the Save or Abandon changes button from the main tool bar.
 

These items may be sorted in any order by clicking on and dragging the box on the left side, to the (vertical) position desired. This order will be the order displayed in the pull downs when using this list in other modules within the system. Suggestion: Have the one most used at the top of the list.

 

Where Used:  In all job logging functions for a product’s work orders.

«Mark as Completed in RoadMap in Section B Item 3-e»

1.8. Work Order Preparation Check List
1.8.1. Preprequisites for the Work Order Preparation Check List
User MUST have full rights to the "System Setup" in System Security to setup these modules. User with "Supervisor Rights" will automatically have access.
1.8.2. Introduction for the Work Order Preparation Check List
Within this module user will enter items to be used in a checklist for a product and it will be used to record that, that action was taken for the work order, by whom and when it occurred.   Examples of check lists might be: Verify product revision, perform tooling setup, complete first article, deburring, or any other critical function for which the user wishes to have a verifiable record of being accomplished. The description of the checklist item may be up to 20 characters in length.   Note:  In order to complete the Unreleased Work Order List  user MUST also have the Product Data Management (PDM) optional module.
1.8.3. Fields and Definitions for the Work Order Preparation Check List
Within this module user will enter items to be used in a checklist for a product and it will be used to record that, that action was taken for the work order, by whom and when it occurred.   Examples of check lists might be: Verify product revision, perform tooling setup, complete first article, deburring, or any other critical function for which the user wishes to have a verifiable record of being accomplished. The description of the checklist item may be up to 20 characters in length.  

Note:  In order to complete the Unreleased Work Order List  user MUST also have the Product Data Management (PDM) optional module. 
 
 
 
1.8.4. How To ....... for the Work Order Preparation Check List
1.8.4.1. Setup the Work Order Preparation Check List
 

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/Work Order Preparation List Module

 
The following screen will be displayed:
 
 
  

Within this module user will enter items to be used in a checklist for a product and it will be used to record that, that action was taken for the work order, by whom and when it occurred.   

To modify this screen, the user must click on the Add or Delete button and supply the password. That action will enable the screen.

Pressing the Add button will enable the data entry boxes at the bottom of the screen for the user to enter new data.

Selecting an existing Work Order Preparation List and pressing the Delete button will remove the selected information.

The user must Save or Abandon changes after modifying the screen.

 
 
1.9. Shop Floor Tracking Defaults

1.9.1. Prerequisites for SFT Defaults
 
Complete the attached worksheet and  "Mark as Completed RoadMap Section B Item 3-fbefore continuing the setup.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
 
 
1.9.2. Introduction for SFT Defaults

There are a number of functions within MANEX that the user may establish as default conditions during operations. Each function relating to this setup screen is described in the Fields & Definitions article.

1.9.3. Fields and Definitions for the SFT Defaults
 
 

Interval for Refreshing Shop Floor

When the user is in the Shop Floor module, and has information displayed on the screen (for example, the wip status of a work order). The user then leaves the screen up and alone to do another task (say breaks for lunch). Then the data represented by the screen may actually undergo changes by other employees. If the user does not use the screen in the meantime, when they return from their alternate task, the information on the screen would be incorrect (because someone else moved material). ManEx performs a periodic update (refresh) to Shop Floor screens when the user has information displayed on the screen, but has not performed any functions in the meantime. The period of the refresh rate is initially set to every two and a half minutes by ManEx. So, if the user has a work order tracking screen displayed with a work order showing wip, and does not perform any transaction for 2-1/2 minutes, ManEx will automatically update the information on the screen. This timing is initially set at 2-1/2 minutes, but the user may change this period in this setup. However, the trade-off for shorter periods is increased network traffic, and setting too many workstations to be refreshed every few seconds will seriously impact the server’s ability to deliver data.

 

USE Work Order Check List

This list is a list from which to choose items to be included as a checklist for a product.  The checklist is created in the Work Order Preparation List module. Examples of check lists might be: Verify product revision, perform tooling setup, complete first article, deburring, or any other critical function for which the user wishes to have a verifiable record of being accomplished. The description of the checklist item may be up to 20 characters in length.   Note:  In order to complete the Unreleased Work Order List  user MUST also have the Product Data Management (PDM) optional module.



Print Work Center Move Ticket When Transfer by Default

Whenever a product is moved from one work center to another, the user has the option to print a move ticket (like a traveler) for each transaction. This move ticket may be printed and accompany the material to the next work center, identifying the work order, product date, work center, etc. The user may choose to turn this feature off by selecting the “Printer OFF” button in the setup. If the printer is turned on (“Printer ON”), then a sheet with the details will be printed for every product movement.

 

Print FGI Labels When Transfers to FGI by Default

Whenever a product is moved from one work center to the Work Center called FGI (Finished Goods Inventory), the user has the option to print a move ticket (like a traveler) for each transaction. This move ticket may be printed and accompany the material to finished goods, identifying the work order, product date, work center, etc. The user may choose to turn this feature off by selecting the “Printer OFF” button in the setup. If the printer is turned on (“Printer ON”), then a sheet with the details will be printed for every product movement.

 

Print Work Instructions on Move Ticket

If the user chooses to print move tickets, then they may also choose whether or not work instructions and work order notes are included in the printing.
 

Pop up Default Printer Selection Dialog

 

When Checked Shop Floor Transfer by Qty/Un-checked - By Panels

If the user chooses to identify material movement by quantity of product, then this option MUST be checked.    If the user wishes to move material by the panel, sheet or roll, they may uncheck this option. This requires the user to define in the product definition the number of products contained in a panel/sheet/roll. Then, if this method is chosen, the user moves panels and ManEx keeps track of the number of units. 
 
 

Bar Code Tracking

If the user is tracking serial numbers through the production process, and is using the ManEx bar code tracking module, then they have the option of defining a default method for picking up the bar-coded serial numbers. One option is to scan one serial number at a time, and collect those serial numbers for processing a transaction. Another option is to enter the beginning and ending serial number of a series of serial numbers and allow ManEx to fill in all of the serial numbers in between for processing a transaction. The third option is for the user to manually enter the quantity of boards to be moved. If the boards are serialized, then a list of serial numbers is presented to the user from which to select the serial numbers being moved with the quantity of parts. The user has the option to change any of these defaults at the time of entry. Please refer to the Shop Floor Tracking Management manual. The ManEx Manufacturing System Software has bar code scan and print capability which is designed primarily for transfer of products in Shop Floor Tracking and input of inspection data by serial number and defect code.

 

Installation: Bar Code Shop Floor Tracking is an OPTIONAL module; it is NOT a part of the Core ManEx MES modules.

·         Upon purchase of this module, ManEx will send a soft-key to activate the module

·         After activation, Bar Coding access for each user must be setup in the ManEx Security module. Users with “Supervisor’s Rights” will automatically have access. 
·         Each client workstation (individual PC) which will be printing Reports, Travelers, Labels, Serial Tags, Physical Inventory Tags and Defect Lists with Bar Coding must have the font installed as an active Windows font.

·         If Bar Coding of Serial Numbers is desired, the Serial Number tracking must be setup in Shop Floor Tracking Defaults

Specification:

·         ManEx uses the Microsoft Truetype BC C39 Narrow Font. See Article #1225  for the installation procedure.

·         Use of a Y-Type keyboard-emulation scanner is supported by ManEx. The scanner output goes into ManEx via the keyboard-input cable. Bar code fields may be scanned or manually entered with the scanner installed.

·         Most scanners require ¼” of white space surrounding the bar code. Laser and inkjet printed labels must have adequate resolution, contrast and clarity to print barcodes that are readable.

·         ManEx recognizes a bar code by an asterisk (*) at the beginning and end of the bar coded field.

 

Serial Number Tracking Method

At the beginning of a ManEx implementation, the user must decide a method for tracking Serial Numbers.   THIS DECISION, ONCE STARTED, IS IRREVOCABLE.  The decision to be made is:
 
1, Do NOT use Serial Number tracking.
2, Serial Number will always be unique.  This will insure that a serial number is unique throughout the company; (meaning once used, can NEVER be used again, no matter what product).   
3, Serial Number will be unique by Product.  This will allow duplicate serial numbers to be used throughout the company,  but they must be unique for a given product, (can be used for other products, but never again for the same  product).  

If Serial Numbers are NOT to be used, then the option will NOT appear when creating new part numbers within the ICM module.
If Serial Numbers ARE used, then the user will have the option when creating parts within the ICM module to either serialize the part or leave it unserialized. 
If Serial Numbers are used on a part, then the user MUST enter Serial Numbers in order to move product through the SFT for shipment. 
The user will also need to define whether Serial Numbers are to be transferred by Work Center or by Activity within a Work Center.
 
For further detail on why the system enforces the uniqueness per Product rule and will not base the uniqueness on SN that exist in the Qty at that time see Article #2495.
 

 

1.9.4. How To ..... SFT Defaults
1.9.4.1. Setup the Shop Floor Tracking Defaults

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/Shop Floor Tracking Defaults Module

 

 

The following screen will be displayed:

 

 

 

The user may edit any of the defaults by selecting the Edit button from the main tool bar and selecting the default to be changed.  Check List items may be added by selecting the Add button from the main tool bar and entering the description of the item to be listed. 
 
Serial Number Tracking Method can NOT be changed once a selection has been made at the beginning of a ManEx implementation.  THIS DECISION, ONCE STARTED, IS IRREVOCABLE.  The decision to be made is:
 
1, Do NOT use Serial Number tracking.
2, Serial Number will always be unique.  This will insure that a serial number is unique throughout the company; (meaning once used, can NEVER be used again, no matter what product).   
3, Serial Number will be unique by Product.  This will allow duplicate serial numbers to be used throughout the company,  but they must be unique for a given product, (can be used for other products, but never again for the same  product).  

If Serial Numbers are NOT to be used, then the option will NOT appear when creating new part numbers within the ICM module.
If Serial Numbers ARE used, then the user will have the option when creating parts within the ICM module to either serialize the part or leave it unserialized. 
If Serial Numbers are used on a part, then the user MUST enter Serial Numbers in order to move product through the SFT for shipment. 
The user will also need to define whether Serial Numbers are to be transferred by Work Center or by Activity within a Work Center.
 
For further detail on why the system enforces the uniqueness per Product rule and will not base the uniqueness on SN that exist in the Qty at that time see Article #2495.

 

 

When the user has completed the changes they must select the Save or Abandon button from the main tool bar, before exiting.

 

Where Used:  In all shop floor functions for a product’s work orders.

 

 

 

Mark as Completed in RoadMap Section B Item 3

1.10. Production Scheduling Method

1.10.1. Prerequisites for Production Scheduling Method
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
 


1.10.2. Introduction for Production Scheduling Method

In this setup, the user defines the method to be used by ManEx to determine the capacities and scheduling in the Capacity Planning module.

1.10.3. Fields and Definitions for the Production Scheduling Method
 
 
Calculate Capacity Load Based on:
 
Run & Setup TImes in Work Order Traveler Setup under Production Planning

The default, “Run & Setup Time” will calculate the resources and costs associated with those entered in the work center setups and activities for the product. The costs will be based on the work center rates, and the capacity on the product routing information.

Run & Setup Times in Activities Setup
under Work Center Setup

The Activities Drivers option may be used in conjunction with the Job Planning module, and will calculate the costs and durations based on parameters entered by the users in the planning module.Normally, the Run & Setup time option is used.  However, once the system has an active capacity planning module in place, the user may use Activities Drivers to schedule priorities in the Dynamic Scheduling Module.

Avg Hrs/Work Day (For Cap Plng)
The system assigns the Average Hrs/Work Day as 24 hours.  This field is for reference only.

No change is required in this setup unless the user is going to make extensive use of the job planning module.

Note:  In order to add Times in Routing, the Run and Setup Time MUST be selected in this module. 
 
 
1.10.4. How To ..... for Production Scheduling Method
1.10.4.1. Setup Production Scheduling Method

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/Production Scheduling Method Module

 

The following screen will be displayed:

 

The user may select the Edit button from the main tool bar to change the defaults.

The user must select the Save or Abandon changes button from the main tool bar after entering the Edit Mode.

Where Used: In all shop floor functions defining labor costs, and for Capacity Planning Modules.

«Mark as Completed in RoadMap in Section B Item 3-g»

1.11. Quality Defect Codes
1.11.1. Prerequisites for Quality Defect Codes
Complete the attached worksheet and  "Mark as Completed RoadMap Section B Item 3-hbefore continuing the setup.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
 
 


1.11.2. Introduction for Quality Defect Codes

In Shop Floor Tracking, the ability to record the results of quality inspections is available to the user. These records usually contain information about the lot or work order being inspected, the quantity of parts viewed, the quantity of parts rejected and the number and types of defects observed in the process. In the ManEx Quality Defect Setup, the user has the opportunity to define these defects, and to shape the manner in which they are used.

1.11.3. Fields & Definitions for Quality Defect Codes

 
 

Entry Mode: The results of inspection may be entered in ManEx in two basic ways: 1, in Batch Mode; and 2, using In-Line processing. Batch mode allows the user to perform the inspection on a batch or lot of materials, and enter the observations at a later time. In this mode, the user does not automatically forward the product to the next workstation, but merely inspects it and allows production personnel to move the material. Using the In-Line mode is like inserting an inspection step at the end of a work center, viewing the parts one at a time, and passing or failing the part. If the part passes, it is moved by ManEx to the next work center, and the user has only to physically move the parts to the next workstation. The ManEx WIP tracking automatically moves the part to the next work center. Parts which fail the inspection may stay in their current work center, be moved to another (rework) work center, or passed on to the following work center, at the option and discretion of the operator.

Most users prefer to use the batch processing, which accommodates sampling procedures, instead of In-Line processing, which always requires 100% inspection. In this setup area, the user selects the default condition for defining the method of data entry.

Rework Cost By: The Cost of Quality may be determined in one of two possible ways: 1, by defining a specific cost to each defect code; and 2, by manual entry of the actual rework time as determined by the inspector during inspection. In this setup area, the user selects whether to track the costs by Defect Cost (assigned to each defect code), or Manually (by entering the rework time as defects are determined).

Defect Code: During the defect logging and entry process, the user will be presented with a list of defects from which to choose the defect observed. These defects codes and descriptions are entered and defined in this setup. The code is a ten-digit character field that will be used to identify the defects on charts, graphs and data collected and printed. The user may enter as many defect codes as needed.

While the user may enter the defect codes in any order they wish, the defect codes may be rearranged so that the most used codes are at the top of the list. This becomes a time-saver when actually entering defects on a lot, as the defect codes are presented in the same order as ordered in the setup. This is done after defect code entry by clicking on the REORDER button just below the defect codes. After pressing this button, the screen will place a small button in front of each defect code. The user may then use the windows drag & drop method to click on a button, hold the mouse button down and drag the code to the order desired. When satisfied that the most used defect codes are at the top of the list, click on the DONE button to secure the order. Alternatively, the user may wish to enter in alphabetical order to ease searches if there are no predominant defects.

Also, to aid the inspector in selecting a defect code, the user may associate a given defect code with one or more work centers. The user selects from the established work centers to include as many work centers for a specific defect as desired. Work centers may also be deleted from a defect code, if the user wishes.
In this manner, the inspector will have a smaller list of defects to select from, but which would include all of the defects for the work center in which the inspection is being performed. The ability to see just defects associated with a specific work order is determined in this setup.

Defect Description: The description is a 20-character field that helps the user further define the code.

Defect Cost: The cost is defined by numeric field formatted as 999.99, and represents the cost of each occurrence of a defect.

Work Center Inspection: The user has the option of viewing defects based on the product routing (Product Routing), or to view all defects (Maximum Routing). The Maximum Routing will show ALL defect codes in inspection, the Product Routing will only display those that have been related to a work center in which the inspection is taking place. However, the user can still opt to see the max (ALL) defects within the Defect Entry screen.

Skip Location
: Associated with the Defect Entry screens are subsets of information relating to the defects observed. Some of these subsets may be very useful to analyze defects causes and origination. If the user completes the Reference Designators in the Bills of Materials, then entering the reference designation for each defect may provide directions for investigation of repeated failures on an assembly. ManEx provides the capability to track the defects to locations, but if the user opts not to enter location information, then they may set the default condition of the screen to exclude location information. Checking the “Skip Location” box on the setup screen does this.

Skip serial no: If the user is not using serial number tracking for defect data collection, this too may be omitted by checking the “Skip Serial No” box on the setup screen.

Skip NPF field: The Skip NPF field “no problems found” will cause the Defect Entry screen to by-pass this information.

The Maximum NPF No box, no problems found, is provided for the user to record when observing the product. If, in the Defect Entry screen, the serial number had previously been rejected, and analysis of the product yield no further problem, either with cosmetics or function, then the user may change this number to 1, meaning the first time it was inspected or tested, no problem was found. If the product serial number is subsequently rejected again, and a second inspection finds a problem, the number may be incremented to a “2”. This will alert users to repeated rejections of a product serial number, one or more times with no discernable defects. If the number of times that a part has experienced an NPF (no problems found) exceeds that established here in the system setup, the user will not be allowed to go further.

“Maximum number of inspections/WC” Box:This field is for serial number use only. The user may define how many times a given serial number can pass through a given Work Center. If the user selects the “Skip Serial Number” field, this max number will be come invisible. In the Defect Entry screen, once the pass number of a serial number exceeds the max number as set up here, a supervisor or special rights password is needed to continue. Please refer to the Implementation – Security 

 
 
 
1.11.4. How To ..... for Quality Defect Codes
1.11.4.1. Setup Quality Defect Codes Module

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/Quality Defect Codes Module

 

The following screen will be displayed:


 
Items may be re-sorted by dragging the box of the left side of the defect desired to the (vertical) position desired, upon exit the re-order will be saved. This order will be the order displayed in the pull downs when using this list in other modules within the system. Suggestion: Have the one most used at the top of the list. 

The user initiates a new defect code by selecting the Add button from the main tool bar.   Note:  When creating a new Defect Code you will want the Defect Code descriptive as possible because this is what appears in the Pareto Chart in the SQC module information.      NOTE:  The  "Defect Code" field is NOT editable once it has been saved.




To associate a Work Center with a defect code, select the Edit button from the main tool bar and place the cursor in the ID Work Center window, as illustrated
 

Select the Work Center.


Enter in the maximum NPF number. Type in the desired number of times for Maximum number of inspections /WC.T his field is for serial number use only.  If the user selects the “Skip Serial Number” field, this max number will be come invisible.  In the Shop Floor Tracking module, Inspections section, once the pass number of a serial number exceeds the max number as set up here, a supervisor or special rights password is needed to continue. 

When all changes have been completed, the user must select the Save or Abandon changes button from the main tool bar. 
 
Select the Edit button from the main tool bar and work centers assigned to or deleted from the defect code.  All fields are editable except for the "Defect Code" field. 
 
 
When all changes have been completed, the user must select the Save or Abandon changes button from the main tool bar. 

User may ONLY delete a Defect Code if it has not been used in the SQC module. This info needs to be retained for history/reporting purposes. If the defect code has been used in the SQC module user will receive the following warning when trying to delete the defect code. 

 
 
If defect code has NOT been used in the SQC module the defect code may be deleted.  User will receive the following confirmation to be sure they want to delete the Defect Code.
 
 
Depress OK to continue or Cancel to abandon the deletion.
 

Where Used:  In all Statistical Quality Control tracking operations and reporting.

«Mark as Completed in RoadMap in Section B Item 3-h»

1.11.5. Reports for the Quality Defect Codes

To obtain the Defect Code Setup Reports within the Web, select the WEB Print button from the ManEx action buttons at the top of the screen. For further detail on How the Reports work within the Web refer to Article #5477.

Note: In order to access the Reports within the Web the Company Root URL must be setup within the System Appearance module and user must be linked to web within the System Security Module. 

 

Select the Report Type:  DEFECT CODE SETUP - A List of Reports will be displayed that are available on the Web for DEFECT CODE SETUP 


To obtain THE DEFECT CODE SETUP Reports within the desktop, select the Print button from the ManEx action buttons at the top of the screen. 


The following reports screen will display a list of reports that are available on the ManEx Desktop:  



Highlight the Master Defect List Report and depress the OK button, the following report will be displayed: 
 
 
 
Highlight the Defect List by Work Center Report and depress the OK button, the following report will be displayed:
 
 
 
1.12. Corrective Action Reporting Problem Types

1.12.1. Prerequisites for CAR Problem Types
Complete the attached worksheet and  "Mark as Completed RoadMap Section B Item 3-ibefore continuing the setup.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
 
 

 
1.12.2. Introduction for CAR Problem Types

If the user is utilizing the CAR (Corrective Action Reporting) module, then the types of corrective actions may be grouped into specific categories in relation to the nature of the problems. For example, one problem type might be Customer Originated corrective actions. Another might be actions required of a Supplier. Another might be directed toward Engineering or Quality departments, or any company function. Another consideration may be to organize the problem types by the target of the action, like a work order or process.

 

1.12.3. Fields & Definitions for CAR Problem Types

 

 

 

If the user is utilizing the CAR (Corrective Action Reporting) module, then the types of corrective actions may be grouped into specific categories in relation to the nature of the problems. For example, one problem type might be Customer Originated corrective actions. Another might be actions required of a Supplier. Another might be directed toward Engineering or Quality departments, or any company function. Another consideration may be to organize the problem types by the target of the action, like a work order or process.

 

Once these problem types are defined, they may be placed in order by clicking on and dragging the box to the left of the type to the (vertical) position desired.

 

 

1.12.4. How To ..... for CAR Problem Types
1.12.4.1. Setup the CAR Problem Types Module

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/CAR Problem Types Module

 

The following screen will be displayed:

 

To Add CAR Problem types, select the Add button from the main tool bar, and enter the type in the text box at the bottom of the list.

The user must select the Save or Abandon changes from the main tool bar.

These items may be sorted in any order by clicking on and dragging the box on the left side, to the (vertical) position desired. This order will be the order displayed in the pull downs when using this list in other modules within the system. 
Suggestion: Have the one most used at the top of the list.


Where Used:
In all Corrective Action activities.

«Mark as Completed in RoadMap in Section B Item 3-i»

1.13. Corrective Action Reporting Number Types

1.13.1. Prerequisites for CAR Number Types
 
Complete the attached worksheet and  "Mark as Completed RoadMap Section B Item 3-jbefore continuing the setup.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
 
 
1.13.2. Introduction for CAR Number Types
This Corrective Action Reporting number type refers to the number of the document that resulted in the corrective action. While the Corrective Action Reporting itself has a number assigned to it, there is usually another document that originates the corrective action. This document may be an RMA (Returned Material Authorization) report from the customer (e.g.  RMA # 0112), and the Corrective Action Reporting Number type would be “RMA Number”. The source document may be a DMR (Discrepant Material Return) originated by production inspection or incoming inspection. The Corrective Action Reporting number type would be “DMR Number” to describe the number identified in the Corrective Action Reporting report. The number type is used solely to identify the source of the numbered document referred to in the Corrective Action Reporting.
1.13.3. Fields & Definitions for CAR Number Types

 

This Corrective Action Reporting number type refers to the number of the document that resulted in the corrective action. While the Corrective Action Reporting itself has a number assigned to it, there is usually another document that originates the corrective action. This document may be an RMA (Returned Material Authorization) report from the customer (e.g.  RMA # 0112), and the Corrective Action Reporting Number type would be “RMA Number”. The source document may be a DMR (Discrepant Material Return) originated by production inspection or incoming inspection. The Corrective Action Reporting number type would be “DMR Number” to describe the number identified in the Corrective Action Reporting report. The number type is used solely to identify the source of the numbered document referred to in the Corrective Action Reporting.

1.13.4. How To ..... for CAR Number Types
1.13.4.1. Setup CAR Number Types Module

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/CAR Number Types Module

 

The following screen will be displayed:

To add CAR Number types, select the Add button from the main tool bar, and enter the type in the text box at the bottom of the list.

The user must select the Save or Abandon changes button from the main tool bar.
 

These items may be sorted in any order by clicking on and dragging the box on the left side, to the (vertical) position desired. This order will be the order displayed in the pull downs when using this list in other modules within the system. Suggestion: Have the one most used at the top of the list.

 

Where Used:  In all Corrective Action activities.

«Mark as Completed in RoadMap in Section B Item 3-j»

1.14. Tools Setup

1.14.1. Prerequisites for Tools Setup
Complete the attached worksheet and  "Mark as Completed RoadMap Section B Item 3-kbefore continuing the setup.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
 
1.14.2. Introduction for Tools Setup
These are the descriptions to be used in the Tools/Fixtures section of the Customer Quote Module.  
 
 

It’s for non recurring charges relating to tools or fixtures, etc. purchased for a particular make assembly.

1.14.3. Fields & Definitions for Tools Setup

 

 

 

These are the descriptions to be selected from in the NRE (Non-Recurring Charges relating to Tools and/or Fixtures) section of the Customer Quote  module.  
 
1.14.4. How To ..... for Tools Setup
1.14.4.1. Setup Tools Setup Module


Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/Tools Setup Module



The following screen will be displayed:

These items may be sorted in any order by clicking on and dragging the box on the left side, to the (vertical) position desired. This order will be the order displayed in the pull downs when using this list in other modules within the system. Suggestion: Have the one most used at the top of the list.

To Add, select the Add button from the main tool bar.  Enter in the description.

To Edit, select the Edit button from the main tool bar.  Highlight the description to be edited, and make any changes.
 
Upon completion the user must  select the Save or Abandon changes button from the main tool bar.
 
To Delete, highlight the item you want to delete, select the Delete button from the main tool bar. 
 
 
Where Used:  Customer Quote module.
 
«Mark as Completed in RoadMap in Section B Item 3-k»
1.15. Outside Program Calls Setup

1.15.1. Prerequisites for Outside Program Calls Setup
Complete the attached worksheet and  "Mark as Completed RoadMap Section B Item 3-lbefore continuing the setup.
 
User MUST have full rights to the "System Setup"  in System Security to setup these modules.   User with "Supervisor Rights" will automatically have access.
 
1.15.2. Introduction for Outside Program Calls Setup
User can enter a program within this screen which is used to create a button that will appear in the Shop Floor Tracking module.  In Shop Floor Tracking, when user depresses this button, they will need to enter a serial number, the program will then gather all the part number, work order information into a text file, and the user defined program will use the text file to print the label. 
 
 
1.15.3. Fields & Definitions for Outside Program Calls Setup

 

This screen is used to create a button which will appear in the Shop Floor Tracking module.  The button will direct the program to a user written program which is used to print labels for serialization.

 

The system automatically enters the screen name as Shop Floor Tracking.  Then the user types in the Button Caption and the name and path of the executable file.

1.15.4. How To ..... for Outside Program Calls Setup
1.15.4.1. Setup the Outside Program Calls Setup Module

Enter the SQLSYSSETTING.EXE (within the ManEx root directory)
This action will then prompt the user for a password

The following screen will be displayed, enter the Production/Outside Program Calls Setup Module

 

The following screen will be displayed:

The system automatically enters the screen name as Shop Floor Tracking.  Select the Edit button from the main tool bar to enter in the caption you want to appear in the Shop Floor Tracking module, then enter in the executable file name.   
 
If you don’t know the executable file name, double click on the Find column.  The browse window will appear:  

 

  

 Select the correct directory.  Highlight the file name, the file name will appear in the File name field.  Depress the "OK" button and the exe file name will default into the Outside Program Calls Setup screen

 
The user must select the Save or Abandon changes button from the main tool bar after entering the Edit mode.
 
 
If the user Saves the changes.  A button will be created in Shop Floor Tracking with the Button Caption name entered in the Setup screen:
 

When user depresses this button, the following screen will appear and they will need to enter a serial number, the program will then gather all the part number, work order information into a text file, and the user defined program will use the text file to print the label.
 
 

 

 

Where Used:   Shop Floor Tracking module.

 

 

«Mark as Completed in RoadMap in Section B Item 3-l»