Prerequisites for MPS & Forecast
Prerequisites Required for Entering a New Master Production Schedule:

ManEx’s standard module configuration allows most users to accomplish their daily tasks.  For those users wanting to get more from ManEx by leveraging the total solutions, this is one of the optional modules available for purchase.   
The forecast module is designed to be the controlling factor for a product when it is used.   To place an order or to learn more about this specific module or any of the other optional modules please contact us at http://manex.com\contactus.aspx 

After activation, "Master Production Schedule" access for each user must be setup in the ManEx System Security module.  Users with “Supervisor Rights” will automatically have access.  

Part number 

The part number must exist for a product or part in the Item Master. 

AVL The Manufacturer Names must exist when using the AVL in the Bill Of Materials.
MRP Policies The Material Requirements Planning policies should exist for each product or part in Inventory Control.