1. Fields & Definitions - EBD
1.1. Header Tab

Header Tab Field Definitions

ECO Number

The number assigned to the ECO, BCN, or Deviation.

Product Number The unique internal number assigned to the product
Rev

The revision number or character assigned to the product.

Description  The description of the product.
Date Opened

The date the ECO/BCN/Deviation was started.

Type

The type of change, either ECO (Engineering Change Order), BCN (BOM Change Notice), or Deviation.  ECO is for permanent changes to the Inventory Item Master and the Bill of Materials when there is a revision or part number change.  BCN is for permanent changes to the BOM.  Deviation is for a one time change to a work order(s).

ECO Source

This is the source of the ECO, Customer or Internal.This allows the users to know if this ECO was created internally or upon Customer request. At this time this field is for reference only, but will be used for reporting later on.

ECO Ref

An internally assigned reference number.

ECO Lock If this box is checked, all users can access the screen, but will not be able to edit the record until Aprroved users remove the lock.  When locked the users initials and date will default in.    

Note: Users MUST have special rights within the Security module to modify this field.

Last Modified The users initials and date will default in when modified.
Status

The status of the Engineering Change Order, either Approved, Edit, Pending or Cancelled.

Effective Date

The date that this ECO become effective.  (This Date MUST be prior to the Work Order date to be applied).

Expiration Date The date that the Deviation will expire.  (This field is only enabled for a deviation and MUST be popluated for the Deviation to be available within the SFT module ) 
Customer

The name of the Customer which is linked with the Bill Of Materials.

This button will allow users the ability to load more documents pertaining to the ECO (cutomer ECO,drawings, instructions,etc).  Loaded files will not be carried fwd to the PDM module upon ECO approval.
Purpose of Change

The intent of the change.

ECO Instruction

The description of the change.

  This Button will allow the users to view any hard copy ECO drawing or Documentation loaded. When files have been loaded this button will appear with Red Text.
 

This Button will allow the users to view any hard copy ECO drawing or Documentation loaded. When files have been loaded this button will appear with Red Text.

ECO Cost per Unit Material is the Material Cost Change Total forwarding from the Parts tab.

Labor is the Labor Cost Change Total forwarding from the New Build Labor Cost tab.

Total is the sum of the changes in Materials and Labor, above.(Note that the signs can be either positive or negative depending upon the changes made.)

Note
: Users MUST have special rights within the Security module to view the pricing information. 
 

ECO Coordinator The name of the engineer entering the Engineering Change Order.
Approvals

The name of the department, initials of the approver and the date of approval.  Note: The approving department is setup in the ECO Setup module.

  This button is used for the approval process for each department indicated

1.2. Parts Tab

Parts Tab Field Definitions - The Parts tab displays any additional changes or deletions of Bill of Material Components.  If the part added has a status of "Inactive" within the Inventory Control Management,  it will be highlighted in purple as an indicator to the user that this item is inactive at this time.  If the user chooses to leave the inactive part on the ECO, that part number record status will automatically be changed to Active upon the "Update Records" button being depressed, so user will not have inactive parts listed on the BOM.  The user will receive a warning that an XLS file has been created for reivew.

Status The status of the component, either Add, Delete, Change.
Line No

The Bill of Materials line number.

Source

The source of the component, either Buy, Make, Phantom or Consign.

Part Number The internal number assigned to the component
Rev The revision character pertaining to the component part number
Class

The classification of the component.

Type The type within the classification of the component
Description The description of the component part number
Old Qty

The quantityof thecomponent currently called for in the Bill of Materials.

New Qty The new quantity ofthe component which will be called for.
Std Amt

The standard cost per the Inventory Control Item Master multiplied by the net change in the number of components used.

Customer Part No

If there is a customer part number associated with the user’s part number, it will appear here.

Rev

The revision character associated with the Customer Part number.

Work Center

The work station where is component is 1st used in the assembly production process.

U/K

Valid entries for this field are “Y” – Yes used in Kit, “N” – Not used in Kit, “F” – Free Stock.The system will default the value to be “Y.”

Scrap Item This field is for reference only, it will not affect any other modules.
Net Change Amount

The sum of the Standard Amount column.

 

The following screen will be displayed, showing the currently available inventory information for the line item highlighted.

  The following screen will be displayed, showing current Open PO for the line item highlighted: 

AVL Information   For the highlighted line item  

 Pref This is a number indicating the preference for use
 Part Mfgr Displays the Part mfgr. name
 Mfgr Part No Displays the Part mfgr. part number
 Checkuse This box will be checked if this Mfg. and Mfg. Part number may be used

 

Reference Designator For the highlighted line item    

Number

The number assigned to the reference designator.

Ref. Designator

The alpha numeric characters assigned to the Reference Designator number.

Prefix

The character assigned to all of the reference designator numbers.

Start No

The first Reference Designator number.

End No

The last Reference Designator number.

Calculate (button)

The button used to calculate the Reference Designator.

Quantity

The new quantity for which Reference Designators have been assigned.

1.3. Update/Create Records Tab

Update/Create Records Tab Field Definitions - This tab displays the revised product number, description, changes in Standard Cost, Labor Cost, whether serial number is required and updates for Engineering Change Orders only.  Note:  This tab is not available for Deviations or BCN.

Inventory Changes section:

Product New No:

If the check box is checked, a new product number may be entered here.

New Rev:

If the check box is checked, the new revision character may be added here.

Note: that either a new Product No or Rev has to be entered in order for the system to allow the user to save the ECO record – this check has been added to prevent any duplicated inventory records within the system.  See Article #3062 on why the customer part number or revision is not updated at the same time.
 
NOTE:  When product is changed through ECO module the same material type will be carried fwd for the next/new product at the part level but not at the AVL level.   
New Description:

If the check box is checked, a new description may be entered.

Change section:

Matl Cost If this box is checked, the material cost for the product will be updated based on the changes made within the Parts Section and the inventory part standard cost.
Labor Cost If this box is checked, the new Labor cost for the product will be updated based on information entered within the ECO New Build Labor Cost section.
Current Value The mat'l or  labor cost currently existing for the product within the Inventory Control Module.
New Value The revised mat'l or labor cost for the product.
Serial # Required If box is checked, user then has the option of checking the "YES" or "NO" box to the right for this part to be a serialized part or not. 
No/Yes If the serial box is checked you have an option to check Yes or No to require the revised product to be a serialized part or not.  NOTE:  This box will remain NO until checked then it will update to YES.
Assigned Customer This will allow the user to Assign a new Customer to the BOM.   NOTE:  This field is only editable if there are NO open Sales Orders or Work Orders linked to this product.
New Customer Name

If the Assigned Customer box is checked, user may select a customer from the pull down. 

Note: Customer name can be changed on the BOM for the product only if either the Product number or revision and the product has no consigned parts for another customer nor any make/phantom parts that are assigned to another customer, and the product is not a sub-assembly for another product.

Open Sales Order List

Shows all SOs (with any status except for cancel) and RMAs with this assembly number, Balance and item number. The selected SOs and RMAs will be updated with the new Product number and/or Rev number and/or Description shown upper left corner.

Note: If there have been no items shipped against the sales order selected then the system will just replace the existing product with the new within the Sales Order.

If shipments have been made against the item the old line item will be have the Ord Qty updated to equal the total Shipped and the status changed to Closed.A new line item will have been create for the new Product/Rev for the remaining balance that was left on the original item.

Retain Sales Order Prices Check this box only if you want the Unit Price to remain the same. 
Retain Remaining Extra Pricing Items Check this box only of you want the extra pricing to remain the same. Note:  If you don't check "Retain Sales Order Prices"checkbox, then for either part itself or extra price item, no price will be updated.  The "Retain Remaining Extra Pricing Items" is for adding extra items only, for the "price" column, it's still controlled by "Retain Sales Order Prices" checkbox. 
 

“Refresh SO” button has been provided so the user can refresh the Sales Order list to check for any new SO created in the system since the ECO was first created.

  This button is depressed to update all records within the system based on the selections made

The rest of this screen comes up with all of the boxes checked for copying the revisions into the Inventory Master, Production Routing, Product Data Management and Bill of Materials. If the user does not want the assembly copied, the box will be unchecked.

1.4. New Build Quote Tab

New Build Quote Tab Field Defintions - This tab desplays Labor Costs associated with the build of the new product number and revision and calculates the New labor Cost associated with each new unit.

Labor Cost Description Description of the labor.
Cost/Unit Cost of the Labor
Net ECO Labor Cost/Unit Sub of the total Labor costs.
Current Total Labor Cost/Unit

This is the total Labor information pulled from the Inventory Control Management module for the Product.

New Labor Cost with ECO/Unit

This is the sum of the new Net Labor and the Current Labor.

1.5. Rework Quote Tab

Rework Quote tab Field Definitions - The Rework Quote tab details any Rework Costs due to reworking the existing quantity in Work In Process and/or Finished Goods Inventory.

Open Work Order List (As of ECO Open Date) window:   Note:  The value of the "as of" is that it can affect the quote pricing and allows customers to better get that information.

Change

A check in this column indicates that the Work Order will be revised to the newly changed product number/revision. The system will automatically update the Work Orders to the newest revision number.  If a kit is in process for the WO selected user MUST depress the "Update Kit" button within the kitting module after the ECO is approved for any part changes to be reflected.   NOTE:   When the ECO takes place and the WO record is updated SFT losses the transfer history for the old revision and starts over with only xfer history for the new revision from that point on.  See Article #3401 for further detail.

Work Order

Shows all WOs (with any status except for cancel) with this assembly number,.  The selected WOs will be updated with the new Product number and/or Rev number and/or Description shown upper left corner.

Balance Qty This field indicates the quantity remaining in the specific Work Order.
Due Date Due date from WO.
Status Status of WO.
Total of Selected WOs

The sum of all of the Balance Quantity column, above.

   Refresh WO button has been provided so the user can refresh the Work Order list to check for any new WO's created in the system since the ECO was first createdThe value of the "refresh" is they can refresh after it was created if they created it several days before the quote is ready.  

Rework Cost Description window:

Rework Cost Description

This is a description of the rework cost line item.

Cost/Unit

This is the cost per unit pertaining to the description on the left.

Total Rework Cost/Unit

The sum of the cost/unit column above.

Inventory Locations (As of ECO Open Date) window:  Note:  The value of the "as of" is that it can affect the quote pricing and allows customers to better get that information.

 Warehouse

The name of the warehouse where the completed product is stored.

 Location

The name of the location (such as Row 13, Bin 3) within the warehouse above.

 Quantity On Hand

The quantity within that location.

   Refresh Invt Location button has been provided so the user can refresh the Invt Location list to check for any new Locations created in the system since the ECO was first created. The value of the "refresh" is they can refresh after it was created if they created it several days before the quote is ready.
 Total

 (As of  ECO Open Date)The total of Finished Goods Inventory.  Note:  The value of the "as of" is that it can affect the quote pricing and allows customers to better get that information

The window at the bottom right hand side of the tab will display the total costs associated with the rework. Note that these costs DO NOT forward into either the Inventory Control Item Master nor the Accounting records.They are not associated with any new products which will be manufactured after the update to the latest revision, but pertain only to the costs associated with reworking either existing WIP or Finished Goods.

Totals (As of ECO Open Date)Note:  The value of the "as of" is that it can affect the quote pricing and allows customers to better get that information

Qty in WIP

This is the quantity in WIP which is available to be reworked.

Qty in FGI

This is the quantity in FGI which is available to be reworked.

Units to Rework:

Qty in WIP

This is the quantity in WIP which is available to be reworked.

Qty in FGI

This is the quantity in FGI which is available to be reworked.

Cost to Rework:

Qty in WIP

This is the quantity in WIP which is available to be reworked.

Qty in FGI

This is the quantity in FGI which is available to be reworked.

 Total Cost to Rework Selected Quantity

This is the sum of the two above amounts.

1.6. Tool & Fixture Quote

Tool & Fixture Quote Field Definitions - Once the ECO record has been approved and updated within the system.  This Tool/Fixture information will then be carried forward into the PDM and Routing Setup modules.

Tool/Fixture Description

This is the description information loaded form the System setup/Tooling Setup for selection.

WC

Work Center

Cost Amount

Original Cost of the Tool/Fixture

Charge Amount

The amounted that is planned to be charged for the Tool/Fixture

Effective Date

Date that the Tool/Fixture becomes effective.

Termination Date

Date that the Tool/Fixture will be terminated.