1. MRP Default Setup
1.1. Prerequisites for MRP Default Setup


Complete the attached worksheet and 
 "Mark as Completed RoadMap Section B Item 4-r"  before continuing the setup.


User MUST have full rights to the "System Setup" in
System Security Users with “Supervisor Rights” will automatically have access.  
 
 
Suggestion:  We suggest that if the MRP takes a larger amount of time to run you may want to schedule it to run during non-working hours.  If you run it during working hours and it takes a large amount of time, you might experience results that you are not expecting.  Because, transactions could have been made in the system after the MRP was started and some data captured in the first part of the run may affect the transaction during the MRP run.  The MRP time stamp does not get updated until the very end of the MRP run.
 
1.2. Introduction for MRP Default Setup

This screen is used to setup what the user wants to see when using MRP. 

1.3. Fields & Definitions for MRP Default Setup

MRP Project Setting

Honor Projects in MRP MRP will Honor the Projects as long as the parts are on order.  Once the parts are received (unless they are kitted immediately) they are no longer allocated as far as MRP is concerned. MRP demands will NOT take into consideration the MIN/MAX for this item.
Ignore Projects in MRP MRP will Ignore Projects and take into consideration the MIN/MAX for this item.

MRP Scrap Setting - Note:  If this field is changed it will update the setting in the Kit Default Setup and visa versa.

Calculate Scrap in MRP If this box is checked scrap will be calculated in the MRP Demands
No Scrap Calculations in MRP If this box is checked scrap will NOT be calculated in the MRP Demands

MRP Kit Status Setting

Honor Kit Status in MRP MRP will Honor Kit Status and no longer instruct you to reschedule, change due date  (for example:   Kits in Process, MRP will no longer instruct the users to reschedule or change due dates)  See the attachment below for an example  (Kit Status_070606.doc)
Ignore Kit Status in MRP MRP will Ignore Kit Status and instruct you to reschedule, change due dates  (for Kits in Process the MRP will now ignore that it is in process and leave quantities as is. The system will only suggest to reschedule if the demand required date is earlier than the scheduled date).  See the attachment below for an example  (Kit Status_070606.doc)

MRP Top Level Scrap Setting

Calculate Scrap for Top Level Assemblies If this box is checked MRP will add the Top Level scrap percentage to Top Level assemblies and all its components.    
No Scrap Calculations for Top Level Assemblies If this box is checked MRP will NOT add the Top Level scrap percentage to Top Level assemblies or any of its components. 

1.4. How To ..... for MRP Default Setup
1.4.1. Setup the MRP Default Setup Module

 Enter System Setup/Material/MRP Default Setup Module  

The following screen will appear:

Depress the Edit button, make your choice(s).  Depress the Save or Abandon changes button. 
 
When editing the MRP Scrap Setting the following warning will appear:  Note:  When this field is changed it will update the setting in the Kit Default Setup  and visa versa.