1. ECO, BCN & Deviation Control Management (EBD) (OPTIONAL Module)
1.1. Prerequisites - EBD


ManEx’s standard module configuration allows most users to accomplish their daily tasks.  For those users wanting to get more from ManEx by leveraging the total solutions, this is one of the optional modules available for purchase.   
To place an order or to learn more about this specific module or any of the other optional modules please contact us at http://manex.com\contactus.aspx

 
After activation, "Engineering Change Order" access for each user must be setup in the ManEx System Security module.  Users with “Supervisor Rights” will automatically have access.
 

The product to be revised must be setup in the Inventory Control Mgmt.

Any new parts to be added must exist in the Inventory Control Mgmt.

A Bill of Materials must exist for the product being revised.
1.2. Introduction - EBD
This module allows users to document the source (internal or customer), the purpose, the details, and the impact of the change.  The module can apply the changes to new and existing jobs, and ensure that production is aware of the change and is using the latest information.  

This module allows users to document the changes using one of the following three approaches:  

"ECO" =  An ECO records Engineering changes for assemblies when there is a Revision or Part Number change.  There can be changes to the Bill of Materials components and/or quantity, to the materials cost, labor cost, whether or not there is a serial number required and to the description. The user can enter whether existing WIP or FGI items are to be scrapped or modified. Once all of the engineering changes are entered, the ECO needs to be approved by the the approvals (as specified in the ECO setup module).  Once the approvals are entered, the user may Update the following records: 
Inventory Master, Product Routing, Product Data Management and Bill of Materials.  NOTE:  These records will ONLY be updated if the Revision or Part Number has been changed. 


"DEVIATION"  =   A Deviation creates a record that someone approved the change in the process for individual work order(s).  Such as using a different part, leaving a part off, or perform a special additional step in the process, etc.  When a Deviation is created within this module no records are updated or changed.  It is a document for reference only.  The user may print the deviation and it will list the work orders selected to be updated.   Deviations have an expiration date so users will know that their customer or management allowed the modification for a limited period of time.

"BCN" =   
When "BCN" type is selected, the user can change all part information just like ECO, but user won't be able to create a new product number/rev, or click any "copy" checkboxes on "Update/Create records" page.  WO and SO lists will also not be available for selections.  When the "Update All Records" button is clicked, the BOM of the product number will be updated just as if the BOM was changed in BOM module.  This feature will track any changes to the BOM through the system.
1.3. Fields & Definitions - EBD
1.3.1. Header Tab

Header Tab Field Definitions

ECO Number

The number assigned to the ECO, BCN, or Deviation.

Product Number The unique internal number assigned to the product
Rev

The revision number or character assigned to the product.

Description  The description of the product.
Date Opened

The date the ECO/BCN/Deviation was started.

Type

The type of change, either ECO (Engineering Change Order), BCN (BOM Change Notice), or Deviation.  ECO is for permanent changes to the Inventory Item Master and the Bill of Materials when there is a revision or part number change.  BCN is for permanent changes to the BOM.  Deviation is for a one time change to a work order(s).

ECO Source

This is the source of the ECO, Customer or Internal.This allows the users to know if this ECO was created internally or upon Customer request. At this time this field is for reference only, but will be used for reporting later on.

ECO Ref

An internally assigned reference number.

ECO Lock If this box is checked, all users can access the screen, but will not be able to edit the record until Aprroved users remove the lock.  When locked the users initials and date will default in.    

Note: Users MUST have special rights within the Security module to modify this field.

Last Modified The users initials and date will default in when modified.
Status

The status of the Engineering Change Order, either Approved, Edit, Pending or Cancelled.

Effective Date

The date that this ECO become effective.  (This Date MUST be prior to the Work Order date to be applied).

Expiration Date The date that the Deviation will expire.  (This field is only enabled for a deviation and MUST be popluated for the Deviation to be available within the SFT module ) 
Customer

The name of the Customer which is linked with the Bill Of Materials.

This button will allow users the ability to load more documents pertaining to the ECO (cutomer ECO,drawings, instructions,etc).  Loaded files will not be carried fwd to the PDM module upon ECO approval.
Purpose of Change

The intent of the change.

ECO Instruction

The description of the change.

  This Button will allow the users to view any hard copy ECO drawing or Documentation loaded. When files have been loaded this button will appear with Red Text.
 

This Button will allow the users to view any hard copy ECO drawing or Documentation loaded. When files have been loaded this button will appear with Red Text.

ECO Cost per Unit Material is the Material Cost Change Total forwarding from the Parts tab.

Labor is the Labor Cost Change Total forwarding from the New Build Labor Cost tab.

Total is the sum of the changes in Materials and Labor, above.(Note that the signs can be either positive or negative depending upon the changes made.)

Note
: Users MUST have special rights within the Security module to view the pricing information. 
 

ECO Coordinator The name of the engineer entering the Engineering Change Order.
Approvals

The name of the department, initials of the approver and the date of approval.  Note: The approving department is setup in the ECO Setup module.

  This button is used for the approval process for each department indicated

1.3.2. Parts Tab

Parts Tab Field Definitions - The Parts tab displays any additional changes or deletions of Bill of Material Components.  If the part added has a status of "Inactive" within the Inventory Control Management,  it will be highlighted in purple as an indicator to the user that this item is inactive at this time.  If the user chooses to leave the inactive part on the ECO, that part number record status will automatically be changed to Active upon the "Update Records" button being depressed, so user will not have inactive parts listed on the BOM.  The user will receive a warning that an XLS file has been created for reivew.

Status The status of the component, either Add, Delete, Change.
Line No

The Bill of Materials line number.

Source

The source of the component, either Buy, Make, Phantom or Consign.

Part Number The internal number assigned to the component
Rev The revision character pertaining to the component part number
Class

The classification of the component.

Type The type within the classification of the component
Description The description of the component part number
Old Qty

The quantityof thecomponent currently called for in the Bill of Materials.

New Qty The new quantity ofthe component which will be called for.
Std Amt

The standard cost per the Inventory Control Item Master multiplied by the net change in the number of components used.

Customer Part No

If there is a customer part number associated with the user’s part number, it will appear here.

Rev

The revision character associated with the Customer Part number.

Work Center

The work station where is component is 1st used in the assembly production process.

U/K

Valid entries for this field are “Y” – Yes used in Kit, “N” – Not used in Kit, “F” – Free Stock.The system will default the value to be “Y.”

Scrap Item This field is for reference only, it will not affect any other modules.
Net Change Amount

The sum of the Standard Amount column.

 

The following screen will be displayed, showing the currently available inventory information for the line item highlighted.

  The following screen will be displayed, showing current Open PO for the line item highlighted: 

AVL Information   For the highlighted line item  

 Pref This is a number indicating the preference for use
 Part Mfgr Displays the Part mfgr. name
 Mfgr Part No Displays the Part mfgr. part number
 Checkuse This box will be checked if this Mfg. and Mfg. Part number may be used

 

Reference Designator For the highlighted line item    

Number

The number assigned to the reference designator.

Ref. Designator

The alpha numeric characters assigned to the Reference Designator number.

Prefix

The character assigned to all of the reference designator numbers.

Start No

The first Reference Designator number.

End No

The last Reference Designator number.

Calculate (button)

The button used to calculate the Reference Designator.

Quantity

The new quantity for which Reference Designators have been assigned.

1.3.3. Update/Create Records Tab

Update/Create Records Tab Field Definitions - This tab displays the revised product number, description, changes in Standard Cost, Labor Cost, whether serial number is required and updates for Engineering Change Orders only.  Note:  This tab is not available for Deviations or BCN.

Inventory Changes section:

Product New No:

If the check box is checked, a new product number may be entered here.

New Rev:

If the check box is checked, the new revision character may be added here.

Note: that either a new Product No or Rev has to be entered in order for the system to allow the user to save the ECO record – this check has been added to prevent any duplicated inventory records within the system.  See Article #3062 on why the customer part number or revision is not updated at the same time.
 
NOTE:  When product is changed through ECO module the same material type will be carried fwd for the next/new product at the part level but not at the AVL level.   
New Description:

If the check box is checked, a new description may be entered.

Change section:

Matl Cost If this box is checked, the material cost for the product will be updated based on the changes made within the Parts Section and the inventory part standard cost.
Labor Cost If this box is checked, the new Labor cost for the product will be updated based on information entered within the ECO New Build Labor Cost section.
Current Value The mat'l or  labor cost currently existing for the product within the Inventory Control Module.
New Value The revised mat'l or labor cost for the product.
Serial # Required If box is checked, user then has the option of checking the "YES" or "NO" box to the right for this part to be a serialized part or not. 
No/Yes If the serial box is checked you have an option to check Yes or No to require the revised product to be a serialized part or not.  NOTE:  This box will remain NO until checked then it will update to YES.
Assigned Customer This will allow the user to Assign a new Customer to the BOM.   NOTE:  This field is only editable if there are NO open Sales Orders or Work Orders linked to this product.
New Customer Name

If the Assigned Customer box is checked, user may select a customer from the pull down. 

Note: Customer name can be changed on the BOM for the product only if either the Product number or revision and the product has no consigned parts for another customer nor any make/phantom parts that are assigned to another customer, and the product is not a sub-assembly for another product.

Open Sales Order List

Shows all SOs (with any status except for cancel) and RMAs with this assembly number, Balance and item number. The selected SOs and RMAs will be updated with the new Product number and/or Rev number and/or Description shown upper left corner.

Note: If there have been no items shipped against the sales order selected then the system will just replace the existing product with the new within the Sales Order.

If shipments have been made against the item the old line item will be have the Ord Qty updated to equal the total Shipped and the status changed to Closed.A new line item will have been create for the new Product/Rev for the remaining balance that was left on the original item.

Retain Sales Order Prices Check this box only if you want the Unit Price to remain the same. 
Retain Remaining Extra Pricing Items Check this box only of you want the extra pricing to remain the same. Note:  If you don't check "Retain Sales Order Prices"checkbox, then for either part itself or extra price item, no price will be updated.  The "Retain Remaining Extra Pricing Items" is for adding extra items only, for the "price" column, it's still controlled by "Retain Sales Order Prices" checkbox. 
 

“Refresh SO” button has been provided so the user can refresh the Sales Order list to check for any new SO created in the system since the ECO was first created.

  This button is depressed to update all records within the system based on the selections made

The rest of this screen comes up with all of the boxes checked for copying the revisions into the Inventory Master, Production Routing, Product Data Management and Bill of Materials. If the user does not want the assembly copied, the box will be unchecked.

1.3.4. New Build Quote Tab

New Build Quote Tab Field Defintions - This tab desplays Labor Costs associated with the build of the new product number and revision and calculates the New labor Cost associated with each new unit.

Labor Cost Description Description of the labor.
Cost/Unit Cost of the Labor
Net ECO Labor Cost/Unit Sub of the total Labor costs.
Current Total Labor Cost/Unit

This is the total Labor information pulled from the Inventory Control Management module for the Product.

New Labor Cost with ECO/Unit

This is the sum of the new Net Labor and the Current Labor.

1.3.5. Rework Quote Tab

Rework Quote tab Field Definitions - The Rework Quote tab details any Rework Costs due to reworking the existing quantity in Work In Process and/or Finished Goods Inventory.

Open Work Order List (As of ECO Open Date) window:   Note:  The value of the "as of" is that it can affect the quote pricing and allows customers to better get that information.

Change

A check in this column indicates that the Work Order will be revised to the newly changed product number/revision. The system will automatically update the Work Orders to the newest revision number.  If a kit is in process for the WO selected user MUST depress the "Update Kit" button within the kitting module after the ECO is approved for any part changes to be reflected.   NOTE:   When the ECO takes place and the WO record is updated SFT losses the transfer history for the old revision and starts over with only xfer history for the new revision from that point on.  See Article #3401 for further detail.

Work Order

Shows all WOs (with any status except for cancel) with this assembly number,.  The selected WOs will be updated with the new Product number and/or Rev number and/or Description shown upper left corner.

Balance Qty This field indicates the quantity remaining in the specific Work Order.
Due Date Due date from WO.
Status Status of WO.
Total of Selected WOs

The sum of all of the Balance Quantity column, above.

   Refresh WO button has been provided so the user can refresh the Work Order list to check for any new WO's created in the system since the ECO was first createdThe value of the "refresh" is they can refresh after it was created if they created it several days before the quote is ready.  

Rework Cost Description window:

Rework Cost Description

This is a description of the rework cost line item.

Cost/Unit

This is the cost per unit pertaining to the description on the left.

Total Rework Cost/Unit

The sum of the cost/unit column above.

Inventory Locations (As of ECO Open Date) window:  Note:  The value of the "as of" is that it can affect the quote pricing and allows customers to better get that information.

 Warehouse

The name of the warehouse where the completed product is stored.

 Location

The name of the location (such as Row 13, Bin 3) within the warehouse above.

 Quantity On Hand

The quantity within that location.

   Refresh Invt Location button has been provided so the user can refresh the Invt Location list to check for any new Locations created in the system since the ECO was first created. The value of the "refresh" is they can refresh after it was created if they created it several days before the quote is ready.
 Total

 (As of  ECO Open Date)The total of Finished Goods Inventory.  Note:  The value of the "as of" is that it can affect the quote pricing and allows customers to better get that information

The window at the bottom right hand side of the tab will display the total costs associated with the rework. Note that these costs DO NOT forward into either the Inventory Control Item Master nor the Accounting records.They are not associated with any new products which will be manufactured after the update to the latest revision, but pertain only to the costs associated with reworking either existing WIP or Finished Goods.

Totals (As of ECO Open Date)Note:  The value of the "as of" is that it can affect the quote pricing and allows customers to better get that information

Qty in WIP

This is the quantity in WIP which is available to be reworked.

Qty in FGI

This is the quantity in FGI which is available to be reworked.

Units to Rework:

Qty in WIP

This is the quantity in WIP which is available to be reworked.

Qty in FGI

This is the quantity in FGI which is available to be reworked.

Cost to Rework:

Qty in WIP

This is the quantity in WIP which is available to be reworked.

Qty in FGI

This is the quantity in FGI which is available to be reworked.

 Total Cost to Rework Selected Quantity

This is the sum of the two above amounts.

1.3.6. Tool & Fixture Quote

Tool & Fixture Quote Field Definitions - Once the ECO record has been approved and updated within the system.  This Tool/Fixture information will then be carried forward into the PDM and Routing Setup modules.

Tool/Fixture Description

This is the description information loaded form the System setup/Tooling Setup for selection.

WC

Work Center

Cost Amount

Original Cost of the Tool/Fixture

Charge Amount

The amounted that is planned to be charged for the Tool/Fixture

Effective Date

Date that the Tool/Fixture becomes effective.

Termination Date

Date that the Tool/Fixture will be terminated.

1.4. How To .... for EBD
1.4.1. Find An Engineering Change Order(ECO), BOM Change Notice(BCN), or Deviation

Enter Quality/Engineering/ECO, BCN & Deviation Control Management (EBD) Module  

The following screen will appear:

 

Depressing the Find action button will bring up a selection screen.

Select the appropriate radial for the find.

 

If you select ECO/Deviation No or ECO Reference No radial, then type the desired number into the box. Once you depress the enter key the system will pull up the matching record onto the screen.

If the system does not find a match to the information entered then the following message will be displayed.

Answer Yes, and then the system will display a listing of available ECO records to choose from.  

 

 If you select to find by Product No, type the product number into the box. If there is more than one Engineering Change Order, a list of all Engineering Change Orders for that product will appear: Highlight and double click on the ECO/Dev No desired.

If you select to find by Status, a further selection will appear. Choose between New, Edit, Approved, Cancelled or Completed by clicking on the appropriate radial. A list of all of the Engineering Change Orders falling within that category will appear. Highlight and double click on the appropriate record.

Information regarding the ECO, BCN, or deviation, will appear. 

 

1.4.2. Edit an ECO, BCN or Deviation

Find an existing ECO, BCN or Deviation.  The information will populate the screen.

Depress the Edit record action button.  Status will change to Edit.

Once the necessary changes have been completed depress the Save record action button to Save changes, or depress the Abandon changes action button to abandon changes.

If the Save record action button is depressed, changes will be saved.  The following screen will appear.  NOTE:  The Approvals will be removed and the ECO changes will need to be re-approved.

The changes will need to be Approved, before the ECO status will change back to Approved.

1.4.3. Adding A New ECO, BCN, or Deviation

To add a new ECO, BCN, or Deviation within the system, open the ECO,BCN, & Deviation Control Management (EBD) module.  

The following screen will appear.
 

Depress the Add Record Action button. Enter your password. The following selection screen will appear.

 

If you decide to find an existing Part Number, depress that button.

The following selection screen will appear:

Type the part number into the red box or highlight it and double click.

 
 

  

If you decide to find the Part Number by Part Class, depress that button.

The following selection screen will appear.

Type the Part Class into the red box or highlight your selection and double click.

 

From there a list of all product numbers within that class will appear.

Type the Part Number into the red box or highlight your selection and double click.

 
 

Information pertaining to that part number will appear on the screen, as follows:
 
 

Select the type of change by depressing the down arrow next to the Type box.

An ECO selection is for a permanent change to the Inventory Master, Bill of Materials and Product Data Management (normally a revision added).    NOTE: These records will ONLY be updated if the Revision or Part Number has been changed.  

A Deviation selection is for a one time change to existing Finished Goods Inventory and/or Work In Process. A selection of Deviation will not update no records; such as  Inventory Master, Bill of Materials or Product Data Management.(The Update/Create Record tab will be grayed out.)  This is a document for reference only.

A BCN selection is to change all part information just like an ECO, but user won't be able to create a new product number/rev, or click any "copy" checkboxes on "Update/Create records" page.  WO and SO lists will also not be available for selections.

 

Select the ECO Source by depressing the down arrow next the the ECO Source box.

 

Type in the ECO Reference.

Enter in the Effective Date. (Note:  This date MUST be prior to the WO Due Date to be applied).
 
Expiration Date field is only enabled when creating a deviation.

Type in the purpose of the change and Description of change.

Type in the name of the ECO Coordinator.

The screen will appear as follows:



PARTS TAB

Enter the Parts screen

To record an ADD to an ECO record 

Depress the Add Button.

The system will then default to the Status field.  Depress the down arrow next to the Status field.

The following choices will appear.  

Select Add from the Status listing. 

 

Enter in the new Line No that it will be listed as on the BOM.

Select Source by depressing on the down arrow next to that field.

The following selection will appear:

 

Type in the Part Number. The Revision number, Type, Class, Description, and  AVL information will update automatically.  If the part added has a status of "Inactive" within the Inventory Control Management,  it will be highlighted in purple as an indicator to the user that this item is inactive at this time.  If the user chooses to leave the inactive part on the ECO, that part number record status will automatically be changed to Active upon the "Update Records" button being depressed, so user will not have inactive parts listed on the BOM.  The user will receive a warning that an XLS file has been created for reivew.    

Type in the new quantity to be used in the assembly.

Type in customer part number and rev. if applicable.
 

Scroll over to the right and choose the Work Center by clicking within the Work Center field. The following selection screen will appear.

 

The system will default into the U/K field, for the component to be included in the kit. You have the option to change this entry to one of the following Yes, No, or Free Stock.

If the user attempts to enter any other characters into this field they will receive the following warning message.

 

Type in the Reference designator(s), enter the character in the prefix box.  Indicate the Start number.  Depress the Calculate button. The Reference Designator will update.

You will then be able to view the Inventory Locations for the highlight part number, by depressing the View Inventory button.The following information will be displayed:

 

You will also be able to view any Open PO for the highlighted part number, by depressing the View Open POs button.The following information will be displayed:

 

The AVL info will default in from the Inventory Control module.  You may check or uncheck the approved AVLs.  If the program finds duplicate part numbers in a BOM, any Alternate part number associated with the original line item will be carried fwd to the new item using the same part.  As far as the AVLs, the program will get all unchecked AVLs from all items and to update all items.  For example, BOM item #2 have AVL A,B,C, and D, only C is unchecked.  Now in ECO, user adds item #5, it has AVL A unchecked.  And if item #2 had a alternate part associated with it, that ALT part will also be carroed fwd to Item #5.  We have added a message in the updating routine, if the system does find duplicate Part number, then a message will popup and let the users know then system will take the actions explained above.  

To update the Reference designator, enter the character in the prefix box. Indicate the Start number. Depress the Calculate button. The Reference Designator will update. 

To record a DELETE to an ECO  

Depress the Add Button.

The system will then default to the Status field.  Depress the down arrow next to the Status field.

The following choices will appear.  

Select Delete from the Status listing.  

 

Type in the Bill of Material line Item, that you wish to have removed from the BOM.

The screen will then update with the information pertaining to that item. 

 

Leave the New Quantity as zero.

If you do not want the part scrapped, scroll to the right and remove the check mark from the Scrap Item field.

To record a CHANGE to an ECO  

 Depress the Add Button.

The system will then default to the Status field.  Depress the down arrow next to the Status field.

The following choices will appear.  

Select Change Qty from the Status listing. 

 

Then type in the Bill of Material line Item, that you wish to have changed on the BOM.

The screen will then update with the information pertaining to that item.



Type in the new quantity.

Update the Reference Designator information.

In the U/K field, change to if you do not want the change to be used in the kit.

If you do not want the item scrapped, remove the check mark from the Scrap Item box.

If you want to change the Work Center where the component is added, depress the down arrow next to the Work Center field.  The following selection screen will appear

Make your selection.

 

UPDATE/CREATE RECORDS TAB

Enter the Update Records screens.(Note:that if the type was selected as Deviation within the Header screen, then the Update Records screen will be grayed out and unavailable for selection)

Inventory Changes Section:

Check the applicable box and then Type in a new product number, revision number, or new description, if desired.   NOTE: The BOM will NOT be updated if no new Product Number or Revision as been created.
 
NOTE:   For the purpose of many users wanting to create several ECOs for the same product number without really updating the records (meaning creating a new part in inventory) Manex will allow you to save and approve the ECO even if they have not selected to create a new Part or Rev within the system. Upon depressing the Update Records button the system will check to see if New Product No or New Rev has been marked, if left blank then the system will just update the status of the ECO to Complete without creating a new product number in the system.
 
NOTE:  When product is changed through ECO module the Material Type will be carried fwd to the next/new Product/Rev that is being generated at the part level, but will not carry fwd the material type at the AVL level. The system will default in "UNK" as the Material Type for the AVL Level. 

If you want to update the Material Cost, then check mark the box next to Matl Cost. The new Value field will update based on the changes made within Parts screen.

If you want to update the Labor Cost, then check mark the box next to Labor Cost.The New Value field will update based on the changes made within the New Build Quote screen.

If you want to require a serial number, then check mark the box next to Serial # Required. Then go to the box under the New Value column it will remain NO until checked then it will update to YES.

If you want to change or assign a customer, check the Assigned Customer box. Depress the down arrow to see a list of customers.  Select the customer of choice.

Note: Customer name can be changed on the BOM for the product only if either the Product number or revision and the product has no consigned parts for another customer nor any make/phantom parts that are assigned to another customer, and the product is not a sub-assembly for another product
 
NOTE:  This field is only editable if there are NO open Sales Orders or Work Orders linked to this product.
 
 

If user is attempting to assign a new customer to a product with any Open Sales Orders or Work Orders linked to it they will receive one of the following messages and will NOT be able to save the ECO.


In the ECO process of modifying or adding Parts to the ECO, there is a field which contains the Customer Part number, if available. At the present time, this field is empty and non-editable for changing or deleting a part from the BOM. But if the user wishes to add a part, they may do so by entering in either the internal part number or the customer part number in the customer part number field, and the program will locate the corresponding internal part number and enter it. The search is based on the customer part number entered AND the customer associated with the BOM from which the ECO was originated.

Because Manex allows users the ability to use the ECO module to create New Part Numbers via the ECO process, and even assign a new customer to the new part number, we must limit the customer information to that of the original customer, as we cannot determine at what point the reference should change customers, or even if it should. Furthermore, if the user does elect to create a new part number for a new customer, items unchecked on the AVL will transfer to the new bom (if checked on the update sheet). However, there may be a conflict between the AVL of the original customer and the AVL of the new customer, so the user is urged to verify the AVL content of a new bom for a new customer created with this module.

COPY SECTIONS:

Look at the items all ready checked to be copied. If you do not want the items copied, uncheck them.
 
Note:  When creating new Product within Inventory via ECO change the new Product's AVL will be auto assigned with the Material Type of "Unk".  It will not keep the MT from the original Product the ECO was originated from. 



    
 

OPEN SALES ORDER LIST:

The Open Sales Order List will include all open Sales Orders including the ones that are flagged as "Admin Hold" and//or "Mfgr Hold",  and any open RMAs against this product.

In the Open Sales Order List, check mark within the Change box column if you want the Sales Order and/or RMA to be changed.

Note: If there have been NO items shipped against the sales order selected then the system will just replace the existing product with the new product and/or revision within the Sales Order.

If there have been shipments made against the item the old line item will have the Ord Qty updated to equal the total Shipped and the status changed to Closed. A new line item will have been created for the new Product/Rev for the remaining balance that was left on the original item.

If you do not want the price changes to affect the sales order prices check the "Retain Sales Order Prices" box. If you would like to retain any extra charges against the line item check the "Retain Remaining Extra Pricing Items" box. 

Refresh SO button has been provided so the user can refresh the Sales Order list to check for any new SO created in the system since the ECO was first created.

 

The completed screen will appear as follows:



NEW BUILD QUOTE TAB

Enter the New Build Quote screen.

To add a new Labor Cost associated with the new revision, depress Add the button. Type in the Labor Cost Description. Type in the new revision cost per unit. Continue to Add as required.

The completed screen will appears as follows:



REWORK QUOTE TAB

Enter the Rework Quote screen. 

In the Open WO List (As of ECO Open Date), check mark within the Change box column if you want the WO to be changed/reworked.  The WO's checked will only be changed/reworked when creating an ECO.  They will not be changed/reworked when creating a deviation.  (This field is for reference only when creating a deviation).  
 
You will receive the following message, as you check each box:



Depress the OK button to continue.
 

NOTE:   When the ECO takes place and the WO record is updated SFT losses the transfer history for the old revision and starts over with only xfer history for the new revision from that point on.  See Article #3401 for further detail.

If needed, you have the option to refresh the Work Order listing to see if any new Work Orders have been created for this product since this ECO was originally opened, by depressing the "Refresh WO" button.

To add costs solely associated with the rework of open Work Orders and/or Finished Goods Inventory, depress the Add button under the Rework Cost Description window. Type in the Rework Cost Description and the related cost per unit.

The Inventory Locations (As of ECO Open Date), will default in and is for reference only.

The Totals (As of ECO Open Date) will default in displaying the quantity in WIP and the quantity in FGI.  The Units to Rework and the Cost to Rework will update automatically.  
 
NOTE:  If you use the ECO module to add a part to a BOM, and flag the ECO to update a work order in WIP, in order to process correctly through the GL, the following criteria must be met:
    • The WO due date must be later than the ECO
    • The ECO must have updated all records
    • The Kit must be updated
    • The changes in the BOM in the Kit must be attended to by either kitting new parts, unkitting deleted parts, or modifying quantities.

The WO in process will be updated with the new revision.

The completed screen will appears as follows:





TOOL & FIXTURE QUOTE TAB

To add new Tool/Fixture Information, depress the Add button below the section.

Then add the Tool/Fixture information from the pull down.

 

 Choose the Work Center from the pull down.  

Fill in the cost amount, Charge Amount, Effective Date, and Termination Date.

Once the ECO record has been approved and updated within the system, this Tool/Fixture information will be carried forward into the PDM and Routing Setup modules.

The completed screen will appears as follows:



Depress the Header tab.
Note that the ECO Cost/Unit columns have updated at the bottom left hand side of the screen:



Depress the Save record action button or the Abandon changes action button.

Upon Saving the user may be given a message if one or more of the parts do not have the same number of reference designators as the new quantity within the ECO, or BCN. This is giving the users the option to print out a report to list these item or not.



If Yes is selected the report, ECO Report Incorrect number of reference designators will go directly to the default printer and
the next message will be displayed.

The user now has the option to cancel out of the save or continue.

The user should go back to the reference designators section for the part listed in the report and change the number of designators to equal the quantity required.

The Approval button will be available. Depress the Approval button.You will be prompted for the appropriate department password. Continue this process until all of the departmental approvals have been entered, as displayed:

 

Once all of the Approvals have been fulfilled then within the Update Records tab the “Update All Records" button will become available.

Depress the Update All Records button. The records you selected will update. The ECO or BCN will now show with the following Updated time stamp.
 
 

 

Note: For a new revision, P/N, etc., go into the Inventory Master and if desired, update for the Warehouse location in the Quantity Information tab (the system will copy the warehouse information from original Product selected).   Also, update for Mfgr Part Spec.
 
 
Adding A New ECO Deviation Record 

Overview:

The difference between the ECO and the Deviation is: A Deviation is a method to document and approve a temporary change from the normal operation until an ECO is created to replace the Deviation, it is only a record that someone approved a change in some method for a work order(s).  That is the reason the Deviation has an Expiration Date field in the main page and it will not update any active modules, part number change, rev change, description change or anything else.  Whereas, ECO is a permanent change and change the part number, or rev or description, or standard cost, or anything thing else including updating any or all active files.

The basic procedure of processing a Deviation follow basically the same rules as a Regular ECO except for the Update Records button is disabled.

Enter the ECO module. Depress the Add Record action button Select the desired product number. Then for the Type Select Deviation

 

Once Deviation has been selected as the Type,  continue on and enter in the remaining Deviation information as explained in the Adding ECO section above.  Note:  For a Deviation you MUST make sure you complete the expiration date so users know that it is for a limited period of time.  If this field is left blank the deviation will NOT be displayed in the SFT module.



Note: 
 The Update Create Records tab will remain grayed out and unavailable for any Deviation records entered within the system.

Once the Deviation has been completed the normal list of Approvals need to be entered.

The status of the Deviation record will update to Approved.

Changing the status of a Deviation from Approved to Completed.

The Status of a Deviation will remain as Approved in the system until the users manually changes the status to Completed.  Once the status of a deviation has been changed from Approved to Completed it will no longer appear in the SFT (Shop Floor Tracking) module.

 

 Find the desired Deviation record.  

Depress the Edit record action button. Click on the down arrow next to the Status field, the following selections will be available for Deviations.

Change the status to Completed.  Depress the Save record action button to save the changes the changes, or depress the Abandon changes action button.

The Deviation will now show in the listing of completed Records.
 
 
1.4.4. Copying An Engineering Change Order

Enter the ECO module. Find an existing ECO record within the system.



Depress the Copy Record action button. The following message will be displayed.

 

Select Yes, enter your password. Then the next message will be displayed.

 

 The following selection will appear.  Depress Part Number.  

The following Part List will be displayed. Select the desired part number.

 

Once you have selected the desired product number the following will be displayed.

 

The following information will be copied fwd from the original ECO to the new ECO record.

  • ECO Type
  • ECO Source
  • Customer 
  • ECO Coordinator
  • New Build Quote Information

 

1.5. Reports - EBD

To print out reports, depress the Report button. The following screen will appear:

 

PRINT OUT OF ECO REPORT

Select the Printout of ECO report and then selecting the Option tab. The following screen will appear:

The ECO record that is open within the ECO module will default in – but the user does have the option to enter in a different ECO # record if desired.

The ECO Printout Report will appear as follows:

ECO STATUS REPORT

If you highlight the ECO Status Report and then depress the Options tab, the following screen will appear:

Select the status by pressing on the down arrow next to the window. Highlight the desired status.

Select the ECO Type.

Type in the From and To Dates.

Select the applicable customer(s) by highlighting and depressing the > arrow.If you want all of the customers, depress the >> arrow.

Note that you have to have a Customer selected in order for this report to work. If the ECO record does not have a customer selected, then it will not appear on this report.

If you want a part range, type in the beginning and the ending part numbers.

Depress the Ok button. The following ECO Status Report will appear as follows:

 

1.6. FAQs- EBD
Facts and Questions for the ECO, BCN & Deviation Control Mgmt (EBD) Module
1.7. ManEx Minutes for (EBD)