Prerequisties for BOM & AVL

Bills of Material (BOM’s) may be created a part at a time or all at once. Although they may be created from the top down or from the bottom up, entering of components and subassemblies first is faster. Copying similar existing BOM’s and editing the copy can greatly shorten the process.  BOM’s can be created as Inactive while under construction to prevent premature use.

Prerequistes

After activation, "Bill of Material and AVL" access for each user must be setup in the ManEx
System Security module.  Users with “Supervisor Rights” will automatically have access.
 
 

Part number for Assembly, Product or Subassembly
must exist in the Inventory Control Mgmt  module.
 
Part numbers for Components and Subassemblies must exist in the Inventory Control Mgmt module.

Work Centers to be Kitted to
must be setup in the Production Work Centers & Acivities module.

Customer Part numbers for Consigned Parts to be added to the BOM must exist in the Inventory Control Mgmt  module.
 
Manufacturer’s Part numbers and Customer’s AVL selections must be setup in the Inventory Control Mgmt  module.
 
Optional Data
 
Component Costs (Standard, Budgeted or Quoted) for manual calculation of the Standard cost of the Assembly.  Note that if the Accounting Module is installed, the cost information must be filled out.
Article ID: 576