ArticlesArticles Most Helpful ArticlesMost Helpful Articles Language SettingsLanguage Settings LoginLogin
RSS Feeds
DrillDown Icon Table of Contents Back
 . . . . . . . . . . . . .
DrillDown Icon Sales
DrillDown Icon Inventory Management
DrillDown Icon Material Planning
DrillDown Icon Production
DrillDown Icon Quality/Engineering
DrillDown Icon Statisical Quality Control (SQC) (OPTIONAL Module)
DrillDown Icon Corrective Action Request (CAR) (OPTIONAL Module)
DrillDown Icon Integrated BOM & AVL
DrillDown Icon Prerequisites
DrillDown Icon Introduction
DrillDown Icon Fields & Definitions
DrillDown Icon How To .....
DrillDown Icon Find a BOM
DrillDown Icon Adding Header Info
DrillDown Icon Adding BOM Line Items & BOM Copy
DrillDown Icon Drag & Drop Procedure
DrillDown Icon Manual Entry
DrillDown Icon Copy an Existing BOM
DrillDown Icon BOM Deletions
DrillDown Icon Edit Line Item Details
DrillDown Icon Bill of Material (BOM) Used in Kit Option
DrillDown Icon BOM Setup Scrap Checkbox
DrillDown Icon Make a Obsolete Part Available on a BOM
DrillDown Icon Link User Defined Fields to a BOM
DrillDown Icon Reports
DrillDown Icon FAQs
DrillDown Icon BOM Import
DrillDown Icon ECO, BCN & Deviation Control Mgmt (EBD) (OPTIONAL Module)
DrillDown Icon Work Order Traveler Setup
DrillDown Icon Product Data Management (PDM) (OPTIONAL Module)
DrillDown Icon PDM Standard Process Specification
DrillDown Icon Administration
DrillDown Icon Accounting
  Email This ArticlePrint PreviewPrint Current Article and All Sub-Articles
 
Drag & Drop Procedure

1.  Procedure for Drag & Dropping

The Drag and Drop Operation allows the user to select components in the Summary screen of Inventory Control Management and drag the items into the Integrated Bill of Material & AVL Main screen to add them as line items in the BOM.

Use this procedure as an alternative to Manually Adding Line Items to a BOM.

Open the Inventory Control Mgt. Summary screen and use Find to display the desired components.

Size the Inventory Control display by placing the cursor on the far right hand side of the display.  Wait until it turns into an arrow.  Holding the mouse button down, move it to the left until just the following displays:

 
 

Open the Integrated Bill of Material & AVL BOM Main screen, position it in the lower right hand corner of the Manex screen.

Depress the Edit button and enter your password.

 

The following selection screen will appear:

Choose Drag and Drop.

 

The following message will appear:

 

Move the cursor to the Inventory window. Highlight the desired component. Use the left mouse button to select an item in the Inventory Control Management screen. Release the left mouse button. RIGHT click on the mouse button and CONTINUING TO HOLD THE RIGHT MOUSE BUTTON DOWN, move the mouse cursor over to the BOM screen. Release the right mouse button.

NoteWhen you drop (release the mouse button), be sure that you have the cursor over the white area,. Drag each component into the BOM in Line Item # sequence.

Enter the quantity of the part per assembly when prompted.  Select the Work Center.

Type in the prefix for the Reference Designator. Type in the Reference Designator Start Number. Depress the Calculate button.

The Number and Reference Designator Fields will fill in.


 

Click on the X button to close the screen.

Depress the Save button in the BOM screen when finished dragging and dropping.

 

Depress the Item Detail tab in the BOM module. The following screen will appear:

Review the detail. If you want to make any changes, depress the Edit button while this screen is open. Type in your password. You may change Item Number, Work Center, Quantity, Production Offset days, Used in Kit, and may add Effectivity Date and Obsolete Date. Depress the Save button.

All the AVL's will default in as approved and require the user to deselect as desired.  If no AVL's are approved a popup will appear forcing the user to approve at least one AVL. 

When the BOM for the assembly has a customer assigned to it, then ManEx will pull the approved AVL's from the customer side NOT the internal side. For example: Part “XYZ” may have several AVL’s and several different customers linked to it.   Each customer may approve different AVL’s. So when the part is linked to a specific customer’s BOM only the AVL’s linked to that customer part will be displayed on the BOM as approved. The AVL screen looks at the accepted AVL’s for that customer on the “consigned” or “Customer” side of each part whether it was added to the BOM as a “BUY”, “MAKE” or “Consigned”. If no customer is assigned to the BOM then the AVL’s will be pulled from the internal side.  NOTE:  If "GENR" is approved on the BOM MRP will consider any inventory for that part even if the AVL is NOT approved on the BOM.   For further detail refer to Article #2560 .

If you want to add alternate parts, depress the AVL and Reference Designator tab. Depress the Edit button. Enter your password. Depress the Add button next to the alternate parts section of the screen.

The following selection option will appear:  

If you select Internal Part Number, a list of all Internal part numbers will appear:

Type the internal part number in the red box or highlight and double click to select.

 

If you select Consigned Part Number, a Customer List will appear:

Type the customer into the red box or highlight and double click

 

A list of all of that customers parts will appear:

Type in the customer part number or highlight the item and double click to access.

:

 

Information regarding the alternate part will display in the bottom section, as displayed below

Depress the Save button.