ArticlesArticles Most Helpful ArticlesMost Helpful Articles Language SettingsLanguage Settings LoginLogin
RSS Feeds
DrillDown Icon Table of Contents Back
 . . . . . . . . . . . . .
DrillDown Icon MX
DrillDown Icon MANUALS and Other Info for SQL MANEX Client Server
DrillDown Icon Hardware and Software Requirements for Installing SQL Server
DrillDown Icon List of Modules Converted to MANEX Client Server
DrillDown Icon Installing SQL Server
DrillDown Icon System Administrator
DrillDown Icon Security System
DrillDown Icon Accounting Setup
DrillDown Icon System Setup
DrillDown Icon Operations Manuals
DrillDown Icon Sales
DrillDown Icon Inventory Management
DrillDown Icon Material Planning
DrillDown Icon Production
DrillDown Icon Quality/Engineering
DrillDown Icon Statisical Quality Control (SQC) (OPTIONAL Module)
DrillDown Icon Corrective Action Request (CAR) (OPTIONAL Module)
DrillDown Icon Integrated BOM & AVL
DrillDown Icon Prerequisites
DrillDown Icon Introduction
DrillDown Icon Fields & Definitions
DrillDown Icon How To .....
DrillDown Icon Reports
DrillDown Icon FAQs
DrillDown Icon BOM Import
DrillDown Icon ECO, BCN & Deviation Control Mgmt (EBD) (OPTIONAL Module)
DrillDown Icon Work Order Traveler Setup
DrillDown Icon Product Data Management (PDM) (OPTIONAL Module)
DrillDown Icon PDM Standard Process Specification
DrillDown Icon Administration
DrillDown Icon Accounting
DrillDown Icon System Utilities
DrillDown Icon SQL Server Memory Settings and Performance
DrillDown Icon Definitions
DrillDown Icon How to schedule and automate backups of SQL Server databases in SQL Server Express
DrillDown Icon SQL_FAQ's
DrillDown Icon Customer Relationship Management (CRM)
DrillDown Icon ManEx Minute
DrillDown Icon ManEx Component Exchange
DrillDown Icon ManEx Supplier Directory & Rankings
  Email This ArticlePrint PreviewPrint Current Article and All Sub-Articles
 
Prerequisties for BOM & AVL

Bills of Material (BOM’s) may be created a part at a time or all at once. Although they may be created from the top down or from the bottom up, entering of components and subassemblies first is faster. Copying similar existing BOM’s and editing the copy can greatly shorten the process.  BOM’s can be created as Inactive while under construction to prevent premature use.

Prerequistes

After activation, "Bill of Material and AVL" access for each user must be setup in the ManEx
System Security module.  Users with “Supervisor Rights” will automatically have access.
 
 

Part number for Assembly, Product or Subassembly
must exist in the Inventory Control Mgmt  module.
 
Part numbers for Components and Subassemblies must exist in the Inventory Control Mgmt module.

Work Centers to be Kitted to
must be setup in the Production Work Centers & Acivities module.

Customer Part numbers for Consigned Parts to be added to the BOM must exist in the Inventory Control Mgmt  module.
 
Manufacturer’s Part numbers and Customer’s AVL selections must be setup in the Inventory Control Mgmt  module.
 
Optional Data
 
Component Costs (Standard, Budgeted or Quoted) for manual calculation of the Standard cost of the Assembly.  Note that if the Accounting Module is installed, the cost information must be filled out.
Article ID: 4783