ArticlesArticles Most Helpful ArticlesMost Helpful Articles Language SettingsLanguage Settings LoginLogin
RSS Feeds
DrillDown Icon Table of Contents Back
 . . . . . . . . . . . . .
DrillDown Icon MX
DrillDown Icon MANUALS and Other Info for SQL MANEX Client Server
DrillDown Icon Hardware and Software Requirements for Installing SQL Server
DrillDown Icon List of Modules Converted to MANEX Client Server
DrillDown Icon Installing SQL Server
DrillDown Icon System Administrator
DrillDown Icon Security System
DrillDown Icon Accounting Setup
DrillDown Icon System Setup
DrillDown Icon General Setup
DrillDown Icon Sales
DrillDown Icon Production
DrillDown Icon Prerequisites
DrillDown Icon Introduction
DrillDown Icon Work Shift Setup
DrillDown Icon Activity Costing & Setup Type Setup
DrillDown Icon Package Configuration
DrillDown Icon Production Work Centers & Activity Setup
DrillDown Icon Time & Attendance Types
DrillDown Icon Work Order Preparation Check List
DrillDown Icon Shop Floor Tracking Defaults
DrillDown Icon Production Scheduling Method
DrillDown Icon Prerequisites
DrillDown Icon Introduction
DrillDown Icon Fields and Definitions
DrillDown Icon How To .....
DrillDown Icon Quality Defect Codes
DrillDown Icon CAR Problem Types
DrillDown Icon CAR Number Types
DrillDown Icon Tools Setup
DrillDown Icon Outside Program Calls Setup
DrillDown Icon Material
DrillDown Icon FAQs
DrillDown Icon Operations Manuals
DrillDown Icon System Utilities
DrillDown Icon SQL Server Memory Settings and Performance
DrillDown Icon Definitions
DrillDown Icon How to schedule and automate backups of SQL Server databases in SQL Server Express
DrillDown Icon SQL_FAQ's
DrillDown Icon Customer Relationship Management (CRM)
DrillDown Icon ManEx Minute
DrillDown Icon ManEx Component Exchange
DrillDown Icon ManEx Supplier Directory & Rankings
  Email This ArticlePrint PreviewPrint Current Article and All Sub-Articles
 
Fields and Definitions for the Production Scheduling Method
 
 
Calculate Capacity Load Based on:
 
Run & Setup TImes in Work Order Traveler Setup under Production Planning

The default, “Run & Setup Time” will calculate the resources and costs associated with those entered in the work center setups and activities for the product. The costs will be based on the work center rates, and the capacity on the product routing information.

Run & Setup Times in Activities Setup
under Work Center Setup

The Activities Drivers option may be used in conjunction with the Job Planning module, and will calculate the costs and durations based on parameters entered by the users in the planning module.Normally, the Run & Setup time option is used.  However, once the system has an active capacity planning module in place, the user may use Activities Drivers to schedule priorities in the Dynamic Scheduling Module.

Avg Hrs/Work Day (For Cap Plng)
The system assigns the Average Hrs/Work Day as 24 hours.  This field is for reference only.

No change is required in this setup unless the user is going to make extensive use of the job planning module.

Note:  In order to add Times in Routing, the Run and Setup Time MUST be selected in this module. 
 
 
Article ID: 3817