ArticlesArticles Most Helpful ArticlesMost Helpful Articles Language SettingsLanguage Settings LoginLogin
RSS Feeds
DrillDown Icon Table of Contents Back
 . . . . . . . . . . . . .
DrillDown Icon Hardware and Software Requirements for Installing SQL Server
DrillDown Icon List of Modules Converted to MANEX Client Server
DrillDown Icon Installing SQL Server
DrillDown Icon System Administrator
DrillDown Icon Security System
DrillDown Icon Accounting Setup
DrillDown Icon System Setup
DrillDown Icon General Setup
DrillDown Icon Sales
DrillDown Icon Production
DrillDown Icon Prerequisites
DrillDown Icon Introduction
DrillDown Icon Work Shift Setup
DrillDown Icon Activity Costing & Setup Type Setup
DrillDown Icon Package Configuration
DrillDown Icon Production Work Centers & Activity Setup
DrillDown Icon Prerequistes
DrillDown Icon Introduction
DrillDown Icon Fields & Definitions
DrillDown Icon Work Center Tab
DrillDown Icon Activity Tab
DrillDown Icon Activity Setup & Run Tab
DrillDown Icon How To .....
DrillDown Icon Time & Attendance Types
DrillDown Icon Work Order Preparation Check List
DrillDown Icon Shop Floor Tracking Defaults
DrillDown Icon Production Scheduling Method
DrillDown Icon Quality Defect Codes
DrillDown Icon CAR Problem Types
DrillDown Icon CAR Number Types
DrillDown Icon Tools Setup
DrillDown Icon Outside Program Calls Setup
DrillDown Icon Material
DrillDown Icon FAQs
DrillDown Icon Operations Manuals
DrillDown Icon System Utilities
DrillDown Icon SQL Server Memory Settings and Performance
DrillDown Icon Definitions
DrillDown Icon How to schedule and automate backups of SQL Server databases in SQL Server Express
DrillDown Icon SQL_FAQ's
  Email This ArticlePrint PreviewPrint Current Article and All Sub-Articles
 
Activity Tab





WC

This is the description of the work center highlighted in the Work Center tab.

Activity ID

This is the abbreviated (4 character) code for the name of the activity.

Activity Description

This is the description of the activity being performed.It may take 25 characters in length. 

Standard Rate

This is the standard hourly rate for the activity performed within the Work Center. 

Cap

Click here for capacity totaling election.Capacity totaling means that if multiple activities are used in a work center, and if there are multiple resources in the activities, the capacity will be the sum of the resources rather than limited by just one resource. 

Activity Costing Description 

This field is selected from the available activity costing descriptions created in the Activity Costing & Setup module within system setup.

Charge Rate

This is the field used to enter hourly charge rates, for each activity. The formatting is three digits to the left of the decimal, and two to the right (999.99). If this optional field is entered, it will be used to determine the hourly charge rate of the activity to which it is assigned.

 

Article ID: 3794