ArticlesArticles Most Helpful ArticlesMost Helpful Articles Language SettingsLanguage Settings LoginLogin
RSS Feeds
DrillDown Icon Table of Contents
DrillDown Icon MX
DrillDown Icon MANUALS and Other Info for SQL MANEX Client Server
DrillDown Icon Customer Relationship Management (CRM)
DrillDown Icon ManEx Minute
DrillDown Icon WireHarness Manufacturing
DrillDown Icon Alternate Parts
DrillDown Icon Outsource Management
DrillDown Icon Documentation Control
DrillDown Icon Supply Chain Management
DrillDown Icon Happy Holidays
DrillDown Icon Customer Credits
DrillDown Icon Publication Changes
DrillDown Icon System Triggers
DrillDown Icon Multi-shift communications
DrillDown Icon Find by Ref Desg
DrillDown Icon BoM Importing
DrillDown Icon Kitting By BoM
DrillDown Icon Business Solution - 24
DrillDown Icon ManEx Solution - 24
DrillDown Icon Minimum Buys and Residual Inventory
DrillDown Icon Customer Part Number Cross Referencing
DrillDown Icon Performance Tracking
DrillDown Icon Work Order Numbering
DrillDown Icon Inventory by Project
DrillDown Icon Counterfeit Components
DrillDown Icon WC Priorities and Scheduling
DrillDown Icon ManEx Minute - Attrition & Scrap
DrillDown Icon ManEx Minute - Kitting
DrillDown Icon ManEx Minute - Assembly Revisions
DrillDown Icon ManEx Minute - Cycle Counting
DrillDown Icon ManEx Minute - Order Status Updates
DrillDown Icon ManEx Minute - Excess Inventory
DrillDown Icon ManEx Minute - MRP Filtering
DrillDown Icon ManEx Minute - Part Shortage Tracking
DrillDown Icon ManEx Minute - Reader Survey
DrillDown Icon ManEx Minute - Supplier Communication
DrillDown Icon ManEx Minute - Production Flexibility
DrillDown Icon ManEx Minute - AVL Management
DrillDown Icon ManEx Minute - Production Offsets
DrillDown Icon ManEx Minute - Obsolescence of MPN
DrillDown Icon ManEx Minute - Customer Owned Inventory
DrillDown Icon ManEx Minute - MRP Sharing
DrillDown Icon ManEx Minute - Announcement
DrillDown Icon Survey Results
DrillDown Icon ManEx Component Exchange
DrillDown Icon ManEx Supplier Directory & Rankings
  Email This ArticlePrint PreviewPrint Current Article and All Sub-Articles
 
ManEx Solution - 24 - Kitting By BoM
Business Case Solution

Each assembly has several steps required to complete production.  Each step may be responsible for placing specific components, yet many systems do not offer an easy way to identify and pull parts for each step.

Some of the most common methods for handling a situation like this are:

  1. Pull parts for all work centers together - This is the easiest way to create a Bill of Material and pull parts for production.  However, it increases the likelihood of lost parts in production.  It makes it difficult or impossible to offset delivery dates for components needed in each work center.  It also makes it difficult to find components in the totes.  However, it may work well for small assemblies (few items on the BoM) or assemblies with few assembly steps.

  2. Creating separate Bills of Material for each work center - This method makes it easy to see which components are required for each work center.  It also makes it easy to adjust the material stream to control cash flow.  However, it also creates excessive work orders to process each work center, and makes it more difficult to tie all work centers to the full assembly (users can overcome this shortfall by making the separate BoMs sub assemblies to the top assembly).

  3. Changing the item numbers to indicate the work center - This allows users to see which parts belong in each work center.  It requires users to manually control the item numbers, and pull parts by item number.  This also is not an efficient method for control the material stream to help cash flow.

  4. Creating inventory locations for each work center - This method breaks inventory into several smaller locations.  Rather than a central inventory containing all parts, each work center has a mini-inventory containing all parts placed in that work center.  This eliminates the need to pull parts for each work center and makes each work center responsible for the parts.  However, it may require more floor space and may make it more difficult to track overall inventory.  (a variation on this method is to have parts in a central inventory and then create a select few production inventory locations to handle and store the high volume common parts).

  5. Using system fields to tie parts to each work center - If the system has a field for indicating the work center or the user can define a field for this purpose, this is the most flexible method.  It allows users to indicate the consuming work center, kit by work center, and offset the material stream for each work center. 

Companies may decide to use a combination of the above methods depending on the complexity of the assembly and production requirements.
 