ArticlesArticles Most Helpful ArticlesMost Helpful Articles Language SettingsLanguage Settings LoginLogin
RSS Feeds
DrillDown Icon Table of Contents
DrillDown Icon MX
DrillDown Icon MANUALS and Other Info for SQL MANEX Client Server
DrillDown Icon Customer Relationship Management (CRM)
DrillDown Icon ManEx Minute
DrillDown Icon WireHarness Manufacturing
DrillDown Icon Alternate Parts
DrillDown Icon Outsource Management
DrillDown Icon Documentation Control
DrillDown Icon Supply Chain Management
DrillDown Icon Happy Holidays
DrillDown Icon Customer Credits
DrillDown Icon Publication Changes
DrillDown Icon System Triggers
DrillDown Icon Multi-shift communications
DrillDown Icon Find by Ref Desg
DrillDown Icon BoM Importing
DrillDown Icon Kitting By BoM
DrillDown Icon Minimum Buys and Residual Inventory
DrillDown Icon Customer Part Number Cross Referencing
DrillDown Icon Performance Tracking
DrillDown Icon Business Case Solutions - 21
DrillDown Icon ManEx Solution - 21
DrillDown Icon Work Order Numbering
DrillDown Icon Inventory by Project
DrillDown Icon Counterfeit Components
DrillDown Icon WC Priorities and Scheduling
DrillDown Icon ManEx Minute - Attrition & Scrap
DrillDown Icon ManEx Minute - Kitting
DrillDown Icon ManEx Minute - Assembly Revisions
DrillDown Icon ManEx Minute - Cycle Counting
DrillDown Icon ManEx Minute - Order Status Updates
DrillDown Icon ManEx Minute - Excess Inventory
DrillDown Icon ManEx Minute - MRP Filtering
DrillDown Icon ManEx Minute - Part Shortage Tracking
DrillDown Icon ManEx Minute - Reader Survey
DrillDown Icon ManEx Minute - Supplier Communication
DrillDown Icon ManEx Minute - Production Flexibility
DrillDown Icon ManEx Minute - AVL Management
DrillDown Icon ManEx Minute - Production Offsets
DrillDown Icon ManEx Minute - Obsolescence of MPN
DrillDown Icon ManEx Minute - Customer Owned Inventory
DrillDown Icon ManEx Minute - MRP Sharing
DrillDown Icon ManEx Minute - Announcement
DrillDown Icon Survey Results
DrillDown Icon ManEx Component Exchange
DrillDown Icon ManEx Supplier Directory & Rankings
  Email This ArticlePrint PreviewPrint Current Article and All Sub-Articles
 
ManEx Solution - 21 - Performance Tracking
ManEx Case Solution

ManEx has optional modules for both production labor tracking and performance analysis.  These modules are designed to simplify production time data collection, and labor and material cost comparison.

  • Time & Attendance (T&A)* - This module allows users to clock in and out of work orders and work centers and in and out of the time clock from any terminal connected to the network.  It will verify that the job is active and that the work center is part of the selected work order.  This verification helps to ensure that the created records are as accurate as possible.

    The standard reports in this module provide information by employee for a selected date range.  In addition to total hours worked, users are able to see which work orders the employee worked in and which employees worked on a selected work order.

  • Job Costing* - This module provides a quick reporting analysis of performance on a selected work order.  After entering expected setup and run times into each step in the routing, users are able to compare both budgeted and actual material and labor (actual labor reporting requires the T&A module).   Because production workers punch in by work center, users are able to see details of which work centers required more time than expected so the quote or process can be changed accordingly.

    The standard reports allow a more detailed analysis of labor, material, and overall performance.


CONCLUSION

NE Company converted to a hybrid labor tracking system.  Most employees had access to at least one terminal for data collection and punched in and out of jobs directly into the integrated module.  For production workers not able to use a terminal for data collection, they recorded their times and projects on paper using the job travelers as a guide to know which work orders and work centers to use.  At the end of the shift, their information was entered into the system.

Using the standard reports and a few custom reports, NE Company was able to not only see how they were doing on each job, but analyze the results of process changes to ensure they were getting the desired benefit.  Within six months, they were able to identify two customers that were consistently unprofitable.

*may require the purchase of an optional module
Article ID: 3299