ArticlesArticles Most Helpful ArticlesMost Helpful Articles Language SettingsLanguage Settings LoginLogin
RSS Feeds
DrillDown Icon Table of Contents Back
 . . . . . . . . . . . . .
DrillDown Icon How can I find table and column names in SQLManex
DrillDown Icon FAQ- KB and Help Desk
DrillDown Icon FAQ- System Admin
DrillDown Icon FAQ- Terminal Server
DrillDown Icon FAQ- System Setup
DrillDown Icon FAQ- System Utilities
DrillDown Icon FAQ- Accounting
DrillDown Icon FAQ- Standard Modules
DrillDown Icon FAQ for Sales Mgmt Modules
DrillDown Icon FAQ for Inventory Mgmt Modules
DrillDown Icon FAQ for Material Planning Modules
DrillDown Icon FAQ for Production Modules
DrillDown Icon FAQ- Work Order Management (WO)
DrillDown Icon FAQs for the Work Order
DrillDown Icon I have an order already kitted to WIP and I need to get it transferred to MRB
DrillDown Icon How do I serialize Work Orders which are partially done?
DrillDown Icon Why are my Work Order Numbers out of Sequence?
DrillDown Icon Why does the system force individual entry for serial numbers with prefixes or characters?
DrillDown Icon FAQ - Capacity & Scheduling
DrillDown Icon FAQ - Shop Floor Tracking (SFT)
DrillDown Icon FAQ for Quality/Engineering Module
DrillDown Icon FAQ for Invoicing Module
DrillDown Icon FAQ- How-to
DrillDown Icon FAQ-Reports
DrillDown Icon FAQ- eManEx
DrillDown Icon FAQ- POSSIBLE REPORT QUERY
  Email This ArticlePrint PreviewPrint Current Article and All Sub-Articles
 
How do I serialize Work Orders which are partially done?
Q.  How do I serialize Work Orders which are partially done?

A.  In order to invoke serialization for a product, it has to be an all-or-nothing situation. You can’t have some parts serialized and some not, otherwise there would be no way to enforce serialization tracking through the Shop Floor Tracking module and then the Packing List module.

If the user has Work Order(s) that have product BELOW the Work Center in which they wish to invoke serialization, then the user will have to move the parts (temporarily) to a work center above that point in the Shop Floor Tracking module. If the user wants serialization throughout the process, then all of the parts will have to be moved back to the Material Staging Work Center.

If the user has already shipped product out of Finished Goods, then receive it back in via Inventory Handling . Move it back in the Shop Floor Tracking module to a Work Center above where you want serialization.

Locate the product number in Inventory Control Mgmt module and check the serialized box for that product.  The user can then go into the WO Traveler Setup  for the product and setup the Work Center in which serialization is required.  After completing that process, update the Work Order(s) in process. (This action may reset the quantities in the Work Order back to the Material Staging Work Center, so that a record of the location of the product in each Work Order should be kept before doing this).
 
The user must then enter the WO Serial Number Control module to assign serial numbers to the Work Order before you will be able to move parts past the Work Center in which serialization is required. 
 
Enter the Shop Floor Tracking module, move the parts back down to their respective position, including any in Finished Goods. 
If the user did have to use the Inventory Handling to put the shipped product back into Finished Goods, they will have to use the Inventory Handling Issue screen to remove them from Finished Goods again. The same change number used in receiving should be used for the issuing.
Article ID: 2546