ArticlesArticles Most Helpful ArticlesMost Helpful Articles Language SettingsLanguage Settings LoginLogin
RSS Feeds
DrillDown Icon Table of Contents Back
 . . . . . . . . . . . . .
DrillDown Icon Utility
DrillDown Icon Sales Management
DrillDown Icon Inventory Management
DrillDown Icon Material Planning
DrillDown Icon Production
DrillDown Icon Shop Floor Tracking by Work Order
DrillDown Icon Shop Floor Tracking by Bar Code (OPTIONAL Module)
DrillDown Icon Work Order Management
DrillDown Icon Capacity & Scheduling (OPTIONAL Module)
DrillDown Icon Dynamic Production Scheduling
DrillDown Icon Prerequisites
DrillDown Icon Introduction
DrillDown Icon Fields and Definitions
DrillDown Icon Work Center
DrillDown Icon Work Order Tab
DrillDown Icon Unscheduled Tab
DrillDown Icon Late Tab
DrillDown Icon Hold Tab
DrillDown Icon Backlog Tab
DrillDown Icon How To ......
DrillDown Icon Capacity Critical Path
DrillDown Icon Production Capacity Setup
DrillDown Icon FAQ - Capacity & Scheduling
DrillDown Icon Time & Attendance (OPTIONAL Module)
DrillDown Icon Job Costing (OPTIONAL Module)
DrillDown Icon Project Setup Module (OPTIONAL Module)
DrillDown Icon Quality/Engineering
DrillDown Icon Administration
DrillDown Icon eManEx
DrillDown Icon ManEx Minutes for All Modules
  Email This ArticlePrint PreviewPrint Current Article and All Sub-Articles
 
Work Order Tab

The Work Order Tab
-  allows the user to schedule the work order
 
 
 
 
Work Order Tab Fields and Definitions
 
Work Order
This field lists the assigned Work Order number.
Part Number
The part number of the assembly assigned to this Work Order.     
Customer
This field lists the customer assigned to this Work Order. 
Wk Ord Qty
This field displays the total Work Order quantity.  
Balance
This field displays the balance left to move into FGI. 
Due Date
This is defaulted in from the Due date entered on the Work Order. 
Schedule Start Date
This is the date the user would enter to begin the Work Order.  (The current date defaults in)
Schedule Complete Date
This is the date the user would enter when the Work Order is to be completed. (The due date from the work order defaults in)
Work Center
These are the Work Centers assigned to this Work Order. 
Date Out
This is the date the system has calculated (based on the setup and run times per each work center) that the product will need to be transfered out of this work center in order to meet the completion date. 
Setup Time (Minutes)
This is Setup time for the full Wk Ord Qty.  (for example if .10 seconds is entered in the Work Order Traveler module for a specific Work Center x 60) = 6.00 minutes.  
Run Time (Minutes)
This is the Run Time entered in the Work Order Traveler module  (for example .060 seconds) x 60 = 3.60 minutes.  
Priority
User can enter the priority they would like this product completed.   
Quantity
This field displays the quantity in the current work center. 
Process Time Required (H) This is the Setup time (6.00 min divided by 60= .10 hours) plus the total Run time (3.60 minutes x WK Order Qty (1000) = 3600 minutes divided by 60 = 60 hours) = 60.10 hours. 
WC Average Capacity

Depress this button to create the schedule once the Schedule start date and Schedule complete date have been entered. 

Depress this button will allow the users to create or view the Work Order notes.  This button will display in RED if any notes are available. 
Depress this button to display any shortage for the work order highlighted.
Depress this button will allow the users to create or view the Work Center notes.  This button will display in RED if any notes are available.
Depress this button will allow the users to create or view the Work Order/Work Center notes.  THis button will display in RED if any notes are available.