ArticlesArticles Most Helpful ArticlesMost Helpful Articles Language SettingsLanguage Settings LoginLogin
RSS Feeds
DrillDown Icon Table of Contents Back
 . . . . . . . . . . . . .
DrillDown Icon System Administrator
DrillDown Icon Security System
DrillDown Icon Trigger Setup
DrillDown Icon System Setup
DrillDown Icon Quick Start
DrillDown Icon Operations Manuals
DrillDown Icon Utility
DrillDown Icon Sales Management
DrillDown Icon Inventory Management
DrillDown Icon Packing List Management
DrillDown Icon RMA Receiver
DrillDown Icon PO Receiving & DMR
DrillDown Icon Kitting, Allocating & Shortage Mgmt
DrillDown Icon Inventory Control Mgmt (ICM)
DrillDown Icon Inventory Control Mgmt (ICM)
DrillDown Icon Inventory Handling
DrillDown Icon IPS Upload
DrillDown Icon Lookup Manufacturer Part Number from XL List
DrillDown Icon Inventory Cycle Count
DrillDown Icon Physical Inventory
DrillDown Icon Standard Cost Adjustment
DrillDown Icon Prerequisites
DrillDown Icon Introduction
DrillDown Icon Fields & Definitions
DrillDown Icon How To ....
DrillDown Icon Std Cost Adjustment Reports
DrillDown Icon FAQs - Standard Cost Adjustment
DrillDown Icon ManEx Minutes-Std Cost Adjustment
DrillDown Icon Part Manufacturer Setup
DrillDown Icon Material Planning
DrillDown Icon Production
DrillDown Icon Quality/Engineering
DrillDown Icon Administration
DrillDown Icon eManEx
DrillDown Icon ManEx Minutes for All Modules
DrillDown Icon Accounting Manuals
DrillDown Icon System Utilities
DrillDown Icon Definitions
  Email This ArticlePrint PreviewPrint Current Article and All Sub-Articles
 
Std Cost Adjustment Reports
To obtain the Standard Cost Adjustment report, select the Print button from the ManEx action buttons at the top of the screen. 



 

The following screen will appear:

Select the appropriate radio for the output format you desire: Screen, Printer, XL File, TXT File, or PDF.

Highlight the desired report and then depress the OK button. 



Standard Cost Rollup Report will print:

 
 
Note:  The calculated cost will only include the costs for ACTIVE parts and subassemblies as of the date of the roll up and will NOT include any parts that may have been identified as inactive either in the item master or in the obsolete date of the part on the BOM.  
 
 
ManEx strives to make the Std Cost Rollup values be in sync with the "BOM with Std Cost" "Top Assembly Costed BOM" report and the  "Indented Costed BOM" report. The following may be why the Standard Cost Roll is different from the Cost BOM Reports.

a)    On the costed BOM Report for a Make/Buy assembly we display the value of the BOM in the costed report, but that total is NOT used in subsequent rollups to higher levels only the standard cost is.  

b)    In Kit Default Setup , user can exclude scrap and setup scrap in Kitting, MRP, and Cost Rollup, this will overwrite what user check in the BOMTherefore, if user checks "Setup Scrap" checkbox in BOM, but checks to exclude in cost roll, the costroll will not calculate setup scrap cost, but BOM will always calculate setup scrap cost if the Setup Scrap checkbox in check in BOM.

Article ID: 1911